Similar Projects
Design/Build Services for Route 146 Reconstruction
Bidding
Providence, RI 02912

Upper College Road Reconstruction Phase 1
Bidding
Kingston, RI

I-95 Resurfacing 2B - Charles Street to Lonsdale Avenue
Post-Bid
Pawtucket, RI

B148 Driveway Repaving.
Post-Bid
$25,000 to $100,000 est. value
Newport, RI

Z--Project # 650-07-102: Pavement Repairs
Results
$2,000,000 to $5,000,000 est. value
Providence, RI 02908

Road Paving
Results
Less than $592,173 est. value
Jamestown, RI

2021 Paver Placed Elastomeric Surface Treatment C-1
Bidding

Asphalt Pavement Improvements
Post-Bid
Coventry, RI

State Traffic Commission Miscellaneous Improvements 2019
Results
Less than $1,678,500 est. value
Providence, RI 02903

Paving Project 2020-2021
Term Contract
Post-Bid
Foster, RI 02825

Pell Bridge Ramps - Phase I - Improvements to JT Connell and Coddington Highway
Results
Providence, RI 02903

2021 Roadway Improvements
Post-Bid
New Shoreham, RI

Green and Complete Streets
Results
Central Falls, RI

Miscellaneous Road Construction - 2021
Post-Bid
Narragansett, RI

East Bay Bike Path Improvements
Results
Warren, RI

Reported 03/25/2020 12:00 AM
Project Title

Paving Indefinite Delivery Indefinite Quantity PWD Newport, Rhode Island

Physical Address View project details and contacts
City, State (County) Newport, RI 02841   (Newport County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Work Requirements: The work includes but is not necessarily limited to, the provision of all labor, materials, equipment, tools, transportation, supplies, and supervision for: excavation, backfill, removal of bituminous materials, reclaiming pavement, saw cutting asphalt and concrete, resetting CB and MH frame and covers, MH rehabilitation, curb removal, curb resetting, disposal of soil containing arsenic and clean soil. The work further includes the provision and installation of new: fill material, gravel base material, bituminous pavement, temporary bituminous patching, curbing, seeding, sodding, cast-in-place concrete, concrete sidewalks, pavement markings, and other associated work and/or material including all incidental work. All work shall comply with the Rhode Island Department of Transportation standard specifications and the specification attached. Each task order will require project oversight and comply with ACOE Safety Manual EM 385 and OSHA.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents