Similar Projects
AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Hail Damage Repair at the Centennial Training Center
Results
Less than $2,325,000 est. value
Fort Carson, CO 80112

Roof Replacement for Station 2
Post-Bid
Colorado Springs, CO 80921

Facilities Roofing Repairs
Results
Less than $103,000 est. value
Colorado Springs, CO 80900

Roofing Envelope Services
Post-Bid

Solids Handling Energy Recovery Facility Roof System Replacement
Results
Fountain, CO 80817

Rock Ledge Ranch Roof Installation
Results
Colorado Springs, CO 80903

Emergency Roof Shoring
Construction
Palmer Lake, CO 80133

CTCF Infirmary Roof Replacement
Results
Less than $800,000 est. value
Colorado Springs, CO

Greenhouse Roof Materials
Results
Colorado Springs, CO

KFL-EPC Roof Replace
Results
$1,500,000 est. value
Colorado Springs, CO 80918

Fire Station 4 and 13 Roof Replacement
Alteration
Post-Bid
Colorado Springs, CO 80906

Colorado Springs Airport Building A Roof Replacement Project
Alteration
Post-Bid
Colorado Springs, CO 80916

Leon Young Service Center Main Facility - Roof System Replacement
Alteration
Results
$500,000 to $600,000 est. value
Colorado Springs, CO 80903

Last Updated 09/03/2021 01:42 PM
Project Title

Market Survey - Colorado Springs ATCT (Cos) Base Building Roof Replacement

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The FAA has a requirements for design and replacement of approximately 14,980 Sq. Ft. of the EPDM roofing with a minimum twenty (20) year roof warranty on the Federal Aviation Administration’s Colorado Springs Airport Traffic Control Tower (COS ATCT) Base Building

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents