Similar Projects
(SS2) 2.6 MG Commerce Drive Settling Pond - City of Saint George
Infrastructure
Conception
$2,014,000 CJ est. value
St George, UT 84790

North Conference Pond (DBW13) - City of Layton
Infrastructure
Conception
$450,000 CJ est. value
Layton, UT 84041

HPER Plaza Reroof - Hazardous Material Abatement
Term Contract, Infrastructure
Design
$400,000 CJ est. value
Salt Lake City, UT 84112

RFP Construction Manager - Marina Expansion
Infrastructure
Bidding
$45,000,000 CJ est. value
Garden City, UT 84028

Great American Outdoors Act - Phase 1
Infrastructure
Bidding
$2,025,313 CJ est. value
Salt Lake City, UT 84111

Cemetery Retaining Wall
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Kaysville, UT 84037

City of Orem Hillcrest Park - Bid Package 1
Demolition, New Construction, Infrastructure
Sub-Bidding
$125,000 CJ est. value
Orem, UT 84097

Hill AFB Base Integrated Environmental Support Tasks (Biest)
Term Contract
Post-Bid
Hill AFB, UT

Environmental Testing
Term Contract
Post-Bid
Hill AFB, UT

CDBG PY21 FY22 Clearance 100 West
Term Contract
Results
Saint George, UT 84770

Asbestos Abatement and Related Services Contract
Term Contract
Results
Farmington, UT

2023 Anderson Wetland Weed Mitigation - SOJO
Term Contract
Sub-Bidding
South Jordan, UT 84095

Meth and Mold Remediation Services
Term Contract
Post-Bid
Fort Duchesne, UT

DFCM Construction- Utah Department of Corrections Draper Prison Site Hazardous Materials Abatement
Term Contract, Infrastructure
Results
$1,380,524 CJ est. value
Draper, UT 84020

2022 Crack Seal Project
Infrastructure
Sub-Bidding
$450,000 CJ est. value
Orem, UT 84057

Last Updated 09/27/2022 05:34 AM
Project Title

Uintah High School Softball Home Run Netting

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $72,609 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Uintah School District is seeking a qualified Contractor to remove and replace the home run netting on the Uintah High School Softball field, 1880 West 500 North, Vernal, UT. All work should be completed by September 30, 2022. Question Submission Close Date 5/18/2022 10:00 AM MDT The Uintah School District is seeking a qualified Contractor to remove and replace the home run netting on the Uintah High School Softball field. The Contractor will be responsible to measure and calculate the netting dimensions and materials needed to complete the work. The Scope of Work includes the following: 1. Home Run Netting: a. Remove and replace home run netting on the UHS Softball field as directed by Donny Laws. Measurement of new net should be 120' x 40' tall. b. Pricing to include landscape restoration and additional poles necessary to accommodate netting.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents