Similar Projects
Spring-Fishburne Drainage Basin Improvements Phase 5 - Pump Station - City of Charleston
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Charleston, SC 29401

Pump Station 104 Rehabilitation - Dorchester County
Renovation
Conception
$500,000 CJ est. value
Summerville, SC 29483

Huger Street Pump Station and Community Area
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Charleston, SC 29403

Pump Station 72 Replacement
Infrastructure
Bidding
$935,000 CJ est. value
Saint George, SC 29477

Northwoods and Popperdam Pump Stations Upgrade
Infrastructure
Bidding
$754,000 CJ est. value
Charleston, SC 29401

Quarry Road and Old Norris Road Lift Stations Rehab
Infrastructure
Post-Bid
$580,000 CJ est. value
Liberty, SC 29657

Pre-Engineered Duplex Pump Station
New Construction, Infrastructure
Post-Bid
$175,000 to $185,000 est. value
Pageland, SC 29728

Broadway at the Beach Pump Station Rehabilitation
Results
$400,000 est. value
Myrtle Beach, SC 29578

Berkeley Dorchester Interconnect Division II
New Construction, Infrastructure
Results
Ridgeville, SC

Construction of the Little Thicketty Creek Pump Station Upgrade
Renovation
Construction
$898,862 CJ est. value
Cowpens, SC 29330

Wild Dunes Pump Station
Infrastructure
Construction
$700,000 CJ est. value
Dewees Island, SC 29451

Pump Station Upgrades and Improvements - City of Rock Hill
Renovation
Conception
$300,000 CJ est. value
Rock Hill, SC 29730

RFP - MCI Flowtronex Pump Station Installation
Renovation
Bidding
$2,000,000 CJ est. value
Bennettsville, SC 29512

Pump Station 2 Construction Services
New Construction
Post-Bid
Murrells Inlet, SC 29576

Hunting Island Booster Pump Station Upgrade
Renovation
Results
Frogmore, SC 29920

Last Updated 06/22/2023 06:02 PM
Project Title

Two Notch #2 Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Lexington, SC 29072   (Lexington County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $757,243 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, the project has been awarded. Construction is expected to commence in July, 2023, and is expected to take 3 months to complete. Replacement of two existing submersible pumps, control panel, valves and misc. equipment. Addition of air scrubber and mixer. Construction Cost Range: $500,000-$1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents