Similar Projects
Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Apron Pavement And Drainage Rehab, Phase 2
Bidding
Jefferson, GA 30549

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Bidding
South Fulton, GA

Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Watervale Drainage Rehabilitation
Bidding
GA

Concrete Tongue and Groove Pipe
Post-Bid
GA

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

FY 2021 Drainage Improvements Project 1
Bidding
Stone Mountain, GA

Hanarry Drive and 847 Jami Court Drainage Improvement (Pew Creek Basin) Project
Post-Bid
Lawrenceville, GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

Roadway Improvements For Holmesville Road
Bidding
Jesup, GA

Spencefield Drainage Box Improvements II
Post-Bid
Less than $75,000 est. value
Moultrie, GA 31788

Reported 11/25/2020 12:00 AM
Project Title

Grayland Hills Drive Drainage

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed by the Contractor consists of but is not limited to: A. Demolition and removal of existing storm drain pipe system including all concrete structures, wood fencing, timber retaining walls, trees, shrubs, etc. as shown on plans to complete the work. B. Installation of 18” HDPE pipe. C. Installation of new Precast Concrete Yard inlet & new headwall. D. Erosion control

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents