Similar Projects
Last Updated | 10/13/2023 02:07 AM |
Project Title | Demolition of Structure at 1033 W Chestnut St |
Physical Address | View project details and contacts |
City, State (County) | Junction City, KS 66441 (Geary County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $30,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The request for bids is for the demolition of the structure at 1033 W Chestnut St. Bids shall be securely sealed and endorsed upon the outside, Demolition of 1033 W Chestnut St. The City reserves the right to reject any or all bids and to waive any informalities in the bidding. Questions regarding the bids should be directed to Code Enforcement at 785-210-2951. SCOPE The work to be done under this contract includes the furnishing of all labor, materials, equipment, barricades and services necessary for, and incidental to, the proper and safe demolition of all buildings on the site. The Contractor shall also be responsible for the complete removal of all debris to include existing trash, brush, limbs and scrub trees under 6" diameter from the entire lot. Contractor is responsible for obtaining all necessary permits. The Contractor receiving the award for demolition of any structures covered in the contract shall have 60 days after the awards of bids to demolish said structures. If said structures are not demolished in this time this contract will be voided and the demolition will be awarded to the next lowest bidding Contractor. DEMOLITION All buildings on the site will be removed down to the basement floor, if a basement exists, to include all walls. All excavations shall be filled, compacted and graded so lot is level with the adjoining grades and lots. Until actual demolition of structures starts, structures shall remain secured and not accessible to the public. After demolition has started, the Contractor shall have a maximum of seven (7) days to remove said structure. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |