Similar Projects
Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

Campus Remodel Projects
Renovation
Conception
Kennedale, TX

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

Pope Elementary School Renovation
Renovation
Design
Arlington, TX 76012

Bear Creek Intermediate School Sidewalk Improvements
Post-Bid
Keller, TX 76248

Maintenance and Operations Bus and POV Parking Lot Expansion
Infrastructure
Post-Bid
Keller, TX

2018 Bond Year 3, Contract 9
Results
Fort Worth, TX 76112

RM2871 - Resurface Roadway
Results
$1,021,821 est. value
TX

Uplift Education Cooks Lane Primary School
New Construction - 62,000 SF
Construction
$12,000,000 est. value
Fort Worth, TX 76120

Uplift Education Elevate Primary School
New Construction - 86,000 SF
Construction
$16,000,000 est. value
Fort Worth, TX 76108

2022 Bond Projects Construction & Renovations
New Construction, Renovation
Conception
Fort Worth, TX

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Harmony School of Innovation Infrastructure
Infrastructure
Post-Bid
Fort Worth, TX 76133

Street Improvements
Results
Hurst, TX

Murphy Express #8961 / Bedford
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Bedford, TX 76021

Last Updated 10/04/2022 04:04 PM
Project Title

2019 Bond - Phase V Projects - Arlington Independent School District

Physical Address View project details and contacts
City, State (County) Arlington, TX 76010   (Tarrant County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Vocational School
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2019 Bond - Arlington Independent School District voters backed a $965.93 million bond package. Phase V Projects scope of work to include: - Heating & A/C, Electrical, Plumbing Improvements - ADA Accessibility Improvements (Door hardware, ramps, restrooms, etc.) - Restroom Renovations - Site Improvements (Lighting, landscaping, drainage, irrigation, signage, etc.) - Paving Improvements - Expanded Security Camera - Coverage and Upgraded Camera Software - Safety & Security Enhancements (Exterior and interior key system upgrades, district communication system upgrades, lighting, fencing, etc.) Phase V Locations include: Seguin HS, Ashworth ES, Pearcy ES, Barnett JH, Bryant ES, West ES, Boles JH, Moore ES, Corey Fine Arts & Dual Language Academy, Wood ES, Anderson ES, Remynse ES, Crouch ES, Patrick ES, Nichols JH, Peach ES, Ellis ES, Larson ES, Ousley JH, Bebensee ES, Beckham ES,Venture / Newcomer, Starrett ES, Williams ES, Mac Bernd PDC, 600 New York, Annex 4, Hilldale Annex Demo, Brown Blvd Auxiliary Warehouse, Food Service Auxiliary Warehouse, Little Road Annex, Ag Science Center, 5618 Green Oaks Final project costs will be announced at a later date. As March 13, 2020, this project is conceptual. Bidding for designers, contractors and a timeline for construction has not been released.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents