Similar Projects
SR 11/Jefferson Highway at SR 211/Rockwell Church Road Natural Gas Relocation
Infrastructure
Bidding
$300,000 est. value
Winder, GA 30680

Natural Gas Main Extension Great Valley Commerce Center
Infrastructure
Bidding
$200,000 est. value
Cartersville, GA

Industrial Air Park
Post-Bid
Bainbridge, GA

Water And Wastewater Treatment Chemicals
Post-Bid
Morrow, GA 30260

Propane Air Mix Plant Emergency Reserve
Results
Robins Afb, GA

Hershall B. Norred Water Treatment Plant Cal-Flo Liquid Lime System Installation
Results
Newnan, GA 30263

Pittman Kiln Gas Line Extension 2022
Infrastructure
Bidding
$200,000 est. value
Moultrie, GA

Blanket Contract for Main Extensions - Natural Gas System
Term Contract, Infrastructure
Post-Bid
Covington, GA

Installation of New Gas Mains and Services
Term Contract
Results
Warner Robins, GA

On-Demand Installation of New Gas Mains on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA

API 653 AST Internal Inspection and Tank Cleaning Robins AFB
Results
Warner Robins, GA

2022 Gas Collection and Control System (GCCS) Expansion at Seminole Road MSW Landfill
Term Contract
Post-Bid
GA

Thompson Mill Rd/Buford Hwy Natural Gas Relocation
Results
Buford, GA 30515

Fuel Tank Inspection - Robins Georgia
Alteration
Post-Bid
Warner Robins, GA

Fuel Farm Development Project
Results
Waynesboro, GA 30830

Reported 06/24/2022 12:00 AM
Project Title

Annual Contract for Natural Gas Construction

Physical Address View project details and contacts
City, State (County) Buford, GA   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of natural gas service lines and renewal of existing natural gas service lines, including service connections, site work, erosion and traffic control, as needed, to complete authorized work. Gas system materials, including pipe, pipe detection wire, valves, fittings, service tees, service risers, meters, and regulators will be furnished by the City for installation by the Contractor. The contract will be in place for a two (2) year period with an additional one (1) year option for renewal.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents