Similar Projects
Recycling Services
Bidding
Bexley, Dublin, Gahanna, Grove City, Hilliard, Lockbourne, New Albany, Reynoldsburg, Urbancrest, Westerville, OH

CPH/ADS-Syringe Disposal Services
Post-Bid
Columbus, OH

Recycling and Trash Removal at CML Locations
Post-Bid
Columbus, OH

S--Solid Waste and Recycling Columbus, Cincinnati, Chillicothe OH and FT Thomas KY
Results
Fort Thomas, KY - Chillicothe, Cincinnati, Columbus, OH

Material Disposal
Results

Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling
Term Contract
Post-Bid

Snow Removal Services 2019 Through 2022
Term Contract
Results
Columbus, OH 43215

Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling (MBE Bidders Only)
Term Contract
Post-Bid

Central College Elementary School Demolition and Site Restoration
Demolition
Results
Less than $180,000 est. value
Westerville, OH 43081

Recycling Services
Term Contract
Post-Bid
Groveport, OH

Disposal Services for Waste Oil
Results

Waste Disposal-HCWP
Post-Bid
Columbus, OH

City Owned Dumpster Service for JPWWTP
Results
Columbus, OH

Trash Collection Services
Term Contract
Post-Bid
Columbus, OH 43215

DEV - Tire Disposal
Results
$5,000 est. value
Columbus, OH 43215

Last Updated 10/12/2020 10:09 AM
Project Title

S--SDVOSB Sources Sought Columbus OH Solid Waste (Repost of 36C25019Q0004 to Correct Formatting Errors from Special Characters, Identical Requirement)

Physical Address View project details and contacts
City, State (County) Columbus, OH 43219   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General waste removal and single stream recycling services: An estimate of the amount of waste to be removed is approximately fifteen (15) cubic yard dumpster for solid waste (five times per week) and two (2) eight (8) cubic yard front load containers for (two days per week) single stream recycling (what time basis).

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents