Similar Projects
Repair Roads for Rebuild
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Tyndall AFB, FL 32403

Paving Improvements
Infrastructure
Bidding
$1,175,000 est. value
Callaway, FL

Front Beach Road Segment 4.1 Powell Adams
Post-Bid
Panama City Beach, FL 32413

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Front Beach Road Segment 3 and Highway 79
Results
Panama City, FL

Street Resurfacing Project FY 2021
Results
Panama City Beach, FL 32413

Hurricane Michael Roadway Rehabilitation Phase VI
Infrastructure
Bidding
$3,000,973 est. value
Panama City, FL

Cherry Street Resurfacing, Sidewalks and Drainage Improvements
Infrastructure
Post-Bid
$500,000 est. value
Callaway, FL

Resurfacing
Results
$5,484,117 est. value
FL

HMA Repaving for TAFB Test Sections
Alteration
Post-Bid
Panama City, FL 32403

Wildwood Road Improvements
Results
Less than $422,000 est. value
Panama City Beach, FL 32407

HMA Repaving for TAFB Test Sections
Alteration
Post-Bid
Panama City, FL

S. Silver Lake Road and Silver Lake Road - Dirt Road Stabilization Project
Results
FL 32438

Paving IDIQ
Term Contract
Post-Bid
Less than $10,000,000 est. value
Tyndall AFB, FL

Resurfacing/Base Work/Drainage Improvements
Results
$18,232,331 est. value
FL

Last Updated 07/18/2022 08:01 AM
Project Title

Roadway Rehabilitation Phase V (Major Resurfacing - Local Roads)

Physical Address View project details and contacts
City, State (County) Panama City, FL   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,446,693 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified contractors to provide all necessary labor, supervision, equipment, and supplies to resurface approximately 9.43 miles of Bay County collector roads. The project will consist of earthwork operations, full depth mixing of existing pavement/base/subgrade, removal of existing pavement structure, replacement of base material, full depth patching, base repair in selected areas, milling, paving, and stabilization of all disturbed areas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents