Similar Projects
C Menomonie, CTH B Construction / Reconstruction
Infrastructure
Conception
$7,000,000 CJ est. value
Colfax, WI 54730

Menomonie - Eau Claire - Construction/Salt Storage Facility
Infrastructure
Conception
$6,000,000 CJ est. value
Menomonie, WI 54751

University of Wisconsin Stout Campus Heating Plant Chimney Repairs
Renovation
Design
$1,788,000 CJ est. value
Menomonie, WI 54751

WIS 72. Pierce/Dunn County Line (Town of Weston) - WIS 25 (Town of Dunn) - Wisconsin Department of Transportation
Infrastructure
Design
$5,999,000 CJ est. value
Menomonie, WI 54751

UW Stout Red Cedar Hall Shower Replacements - GPC
Renovation
Bidding
$986,000 CJ est. value
Menomonie, WI 54751

Envelope Repairs
Renovation
Bidding
$156,400 CJ est. value
Menomonie, WI 54751

Menomonie - Ridgeland; S Fork Lower Pine Creek C-17-0049
New Construction, Infrastructure
Post-Bid
$750,000 CJ est. value
Menomonie, WI 54751

Menomonie High School Athletic Complex Site Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Menomonie, WI 54751

Waste Water Treatment Plant Facility Improvements - Phase II
Infrastructure, Renovation
Results
$7,150,584 CJ est. value
Menomonie, WI 54751

Waste Water Treatment Plant Facility Improvements - Phase II
Infrastructure, Renovation
Results
$7,150,584 CJ est. value
Menomonie, WI 54751

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

STH 72, Ellsworth - Downsville, Pierce/Dunn County Line to STH 25
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Menomonie, WI 54751

STH 72, Ellsworth - Downsville, Pierce/Dunn County Line to STH 25
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Menomonie, WI 54751

Maplewood Eco Cottages
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Menomonie, WI 54751

Last Updated 06/16/2023 09:14 AM
Project Title

Shower Replacements Red Cedar Hall - MEP

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) College/University, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $769,800 [brand] Estimate
Plans Available from Architect - 04/20/23
Owner View project details and contacts
Architect View project details and contacts
Description

Thereby agree to execute a subcontract with the General Prime Contractor awarded the contract for the project designated above and to furnish satisfactory separate 100% Performance Bond and 100% Payment Bond in the amount specified no later than ten (10) days after execution of the subcontract with the General Prime Contractor, and to provide all labor and material required. In general, the work consists of: removing and replacing 64 unitized fiberglass shower surrounds with an on-site fabricated tile base, ceramic tiled walls, plumbing connections, shower controls, ceramic tile floor and base for the drying area, and painted walls and ceiling. Finish material immediately adjacent to the showers will be removed and replaced to provide a watertight environment in and around the shower.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents