Reported 01/26/2022 10:35 PM
Project Title

Bunker Hill Drive Rehabilitation

Physical Address View project details and contacts
City, State (County) Algonquin, IL 60102   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes street rehabilitation (full depth reclamation) to the following streets: • Bunker Hill Drive • Sherman Road to Greens View Drive (4,300 ft.) • Parkside Court (250 ft.) • Pine Grove Court (300 ft.) The project will also include spot curb and gutter replacement, sidewalk replacement and utility rehabilitation. This project includes full reconstruction of the intersection of Parkside Court and Bunker Hill Drive. The bike path along the south side will be resurfaced with a minimum of 2 ½" of surface course and 6" of stone base for the entire limits and a push button will be installed at Jacobs High School.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents