Similar Projects
Highway 5 Gas Station
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Douglasville, GA 30135

Highway 5 Gas Station
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Douglasville, GA 30135

The Westin Hotel and Conference Center at Foxhall Resort
New Construction, Infrastructure
Design
$180,000,000 CJ est. value
Douglasville, GA 30135

The Westin Hotel and Conference Center at Foxhall Resort
New Construction, Infrastructure
Design
$180,000,000 CJ est. value
Douglasville, GA 30135

RFQ Construction Manager At Risk - Construction Manager At-Risk Services for Recycling Center
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Douglasville, GA 30134

RFQ Construction Manager At-Risk Services - Douglasville Recycling Center
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Douglasville, GA 30134

Douglasville-Douglas County Water & Sewer Authority Administrative Building Addition/Renovation - 100% CD
Addition, Demolition, Infrastructure, Renovation - 37,809 SF
Post-Bid
$3,850,000 CJ est. value
Douglasville, GA 30134

Douglasville-Douglas County Water & Sewer Authority Administrative Building Addition/Renovation - 100% CD
Addition, Demolition, Infrastructure, Renovation - 37,809 SF
Post-Bid
$3,850,000 CJ est. value
Douglasville, GA 30134

T32-PCC-SR139 Cascade Ave. 113092
Infrastructure
Results

Construction of an ADA Ramp
Infrastructure
Results
Douglasville, GA 30135

Cobb Tunnel Sewer Connection
Renovation, Infrastructure
Construction
$6,407,915 CJ est. value
Douglasville, GA 30134

Microsoft Data Center / Douglasville
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Douglasville, GA 30135

Astoria at Crystal Lake
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Douglasville, GA 30134

Oakmont Skyview Drive Warehouse
New Construction, Infrastructure - 181,430 SF
Pending Verification
$20,000,000 CJ est. value
Lithia Springs, GA 30122

Blue Heron Rookery Apartments
New Construction, Infrastructure
Conception
$165,000,000 CJ est. value
Douglasville, GA 30122

Last Updated 07/18/2023 10:04 AM
Project Title

South Central Wastewater Treatment Plant Aerator Addition

Physical Address View project details and contacts
City, State (County) Douglasville, GA 30135   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Work is located at the following Site: 1. South Central WWTP - 5400 Fouts Mill Road, Douglasville, GA 30135 B. The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: 1. Installation of Owner furnished aeration equipment: one mixer in each of two aeration basins, DO meters, transmitters, and VFD panels. 2. Modification of existing control panel to accommodate new aeration controls. 3. Construction of two walkways (one per basin) for access to new DO meters located as shown in Contract Drawings. 4. Associated electrical work and new duct bank. 5. Testing and startup. South Central Wastewater Treatment Plant Aerator Addition for Douglasville. Qualified contractors for the performance of the South Central Wastewater Treatment Plant Aerator Addition Project (the Project), as more fully described in the Invitation for Bids. The scope of work includes the provision by the Contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work. The Project will be turn key and require minimal involvement of Authority personnel. The work to be performed shall include: 1. Installation of Owner furnished aeration equipment: one mixer in each of two aeration basins, DO meters, transmitters, and VFD panels. 2. Modification of existing control panel to accommodate new aeration controls. 3. Construction of two walkways (one per basin) for access to new DO meters located as shown in Contract Drawings. 4. Associated electrical work and new duct bank. 5. Testing and startup. Special Conditions and Appendices contain more detailed information on the Project scope. All work will be performed on Authority owned property. All anticipated federal, state, and local permits required for the Project have been obtained.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents