Similar Projects
Annual and Semi-Annual HVAC Chiller Maintenance Service
Bidding
Charleston, SC 29412

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

MUSC HCC 4th Floor Mechanical Room Cooling
Post-Bid
Less than $100,000 est. value
Charleston, SC

Coastal Center-HVAC Replacement at Hillside Dorm 520
Results
$150,000 to $200,000 est. value
Summerville, SC

Coastal Center - HVAC Replacement at Highlands 510
Results
$400,000 to $500,000 est. value
Summerville, SC

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

SCDMH Charleston Mental Health Chiller Replacement
Results
$130,000 to $180,000 est. value
Charleston, SC 29414

Repair Maintenance Facility Building 536
Post-Bid
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

5 Ton Leibert Split System Replacement
Results
Charleston, SC 29412

Air Duct Cleaning Equipment
Post-Bid
Charleston, SC 29425

Preventative Maintenance for Chiller and Major Mechanical System Equipment
Results
Charleston, SC

Basic Science Building Rooftop Exhaust Fans Replacement (Non-Strobic)
Post-Bid
Less than $250,000 est. value
Charleston, SC

Provide and Install Two 10 Ton HVAC Units on TTC Berkeley Campus
Term Contract
Results
Moncks Corner, SC 29461

J--Krauss MRI Chillers (Brundage) / 534-19-3-2715-0256
Post-Bid
Charleston, SC 29401

Heat Pumps / Air Conditioners for Liberty, George and Mcalister Hall - Similar 1
Results
Charleston, SC

Reported 08/23/2019 12:00 AM
Project Title

Storm Eye Institute Chiller Replacement - Phase II

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Berkeley County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Remove existing 200 ton and 350 ton air cooled chillers (and associated piping) from Storm Eve Institute roof and install new 600 ton water cooled chiller and 600 ton cooling tower on roof of Children's Hospital. Provide new chilled water and condenser water pumps.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents