Similar Projects
Pinto Campus IT Operations Data Center Chiller Replacement
Renovation
Sub-Bidding
$1,133,000 CJ est. value
Las Vegas, NV 89106

Chiller Replacement Enterprise Library
Renovation
Sub-Bidding
$300,000 CJ est. value
Las Vegas, NV 89123

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

J045--Chiller Comprehensive Service and Maintenance
Results

Satellite Energy Plant (SEP) Cooling Tower Repair
Results
$350,000 est. value
Las Vegas, NV 89154

IBMF AND SMF HVAC Project Improvements
Renovation
Sub-Bidding
$300,000 CJ est. value
Las Vegas, NV 89101

90 Ton High Ambient Air-Cooled Chiller
Alteration
Post-Bid
Las Vegas, NV 89106

45--Supply and Replace HVAC Units
Results
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

Replace HVAC Components, Roof, and Security Walter Johnson Junior High School Academy of International Studies
Alteration
Post-Bid
$7,614,477 est. value
Las Vegas, NV 89145

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$182,681 est. value
Las Vegas, NV

Air Duct Cleaning Set-Up
Term Contract
Post-Bid

Cooling Tower Maintenance and Repair Services
Results
North Las Vegas, NV 89121

Terminal Unit Replacement
Alteration
Post-Bid
$725,000 est. value
Las Vegas, NV 89147

Replace HVAC Controls and Roof Fredric W Watson Elementary School
Results
$310,000 est. value
North Las Vegas, NV 89031

Last Updated 12/21/2022 03:06 AM
Project Title

Scope 2 - Pinto Campus Public Administrator: Chiller and Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89106   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,352,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CLARK COUNTY, NEVADA INVITATION TO BID BID No. 606340-22 - Pinto Campus - Public Admin/Guardian Building and Warehouse Building Roof Replacement Public Administration Guardian Building - Chiller and Cooling Tower Replacement. Information can be found on the Clark County website under "Current Opportunities" or by calling (702) 455-2897. A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel The "Project" of which the "Work" of the Contract is a part titled Pinto Campus Administrator Building Chiller and Cooling Tower Replacement (RP.D0920046) and is located at 1700 Kenyon Place Las Vegas, Nevada 89106. The "Work" is described in the Project Drawings and Divisions 01 through 26 of the Project Manual. The Work consists of the modification to air handler 1 and 2 on the Public Administration Guardian Building, including modifications to the existing hydronic piping and valves servicing the units including repair and replacement. Selective demolition for removal of all existing infrastructure, piping, and equipment, including safing off and disconnections needed to remove the existing cooling tower and chiller from the site. Construction includes all administrative work as outlined in Division 1 General Requirements and the following using materials noted on Drawings and Specifications: Demolition of the existing cooling tower and chiller, including the removal of all existing infrastructure, piping, and equipment; installation of new concrete modifications to existing concrete housekeeping pads; installation of new drip plan above existing soffit located below existing air handlers 1 & 2, and waterproofing modifications, patch and repair gypsum board soffit in penthouse of the Public Administration Guardian Building where removed or damaged for/during construction, paint interior & exterior walls, ceilings, parapets to match existing, apply high performance coating on structural members disturbed by construction Provide, permit, and install temporary chillers, piping, and feeders to maintain existing systems while the new systems are being replaced; System shall be tested and run for (2) full weeks prior to any work being started on the chiller/cooling tower replacement, utility shut downs shall be coordinated in advance and scheduled in accordance to Division 1 General Conditions. Work hours: The General Contractor will perform construction activities during the following times: General work shall be conducted Sunday through Saturday starting from 6:00 pm to 6:00 am. Utility interruptions shall be coordinated with the Owner's Representative one week in advance and shall be scheduled to occur between Friday 6:00 am and Monday 2:00 am. Construction access into warehouse space will require staff escort and shall be coordinated with Owner's Representative no less than 48 hours in advance. All dates and times will be outlined in the Project Schedule as required per Section 01 32 16 - Progress Schedule. Contractor will notify Owner's Representative when changes to the submitted working days/hours are deemed necessary. PN - L19021

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents