Similar Projects
Last Updated | 12/21/2022 03:06 AM |
Project Title | Scope 2 - Pinto Campus Public Administrator: Chiller and Cooling Tower Replacement |
Physical Address | View project details and contacts |
City, State (County) | Las Vegas, NV 89106 (Clark County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,352,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CLARK COUNTY, NEVADA INVITATION TO BID BID No. 606340-22 - Pinto Campus - Public Admin/Guardian Building and Warehouse Building Roof Replacement Public Administration Guardian Building - Chiller and Cooling Tower Replacement. Information can be found on the Clark County website under "Current Opportunities" or by calling (702) 455-2897. A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel The "Project" of which the "Work" of the Contract is a part titled Pinto Campus Administrator Building Chiller and Cooling Tower Replacement (RP.D0920046) and is located at 1700 Kenyon Place Las Vegas, Nevada 89106. The "Work" is described in the Project Drawings and Divisions 01 through 26 of the Project Manual. The Work consists of the modification to air handler 1 and 2 on the Public Administration Guardian Building, including modifications to the existing hydronic piping and valves servicing the units including repair and replacement. Selective demolition for removal of all existing infrastructure, piping, and equipment, including safing off and disconnections needed to remove the existing cooling tower and chiller from the site. Construction includes all administrative work as outlined in Division 1 General Requirements and the following using materials noted on Drawings and Specifications: Demolition of the existing cooling tower and chiller, including the removal of all existing infrastructure, piping, and equipment; installation of new concrete modifications to existing concrete housekeeping pads; installation of new drip plan above existing soffit located below existing air handlers 1 & 2, and waterproofing modifications, patch and repair gypsum board soffit in penthouse of the Public Administration Guardian Building where removed or damaged for/during construction, paint interior & exterior walls, ceilings, parapets to match existing, apply high performance coating on structural members disturbed by construction Provide, permit, and install temporary chillers, piping, and feeders to maintain existing systems while the new systems are being replaced; System shall be tested and run for (2) full weeks prior to any work being started on the chiller/cooling tower replacement, utility shut downs shall be coordinated in advance and scheduled in accordance to Division 1 General Conditions. Work hours: The General Contractor will perform construction activities during the following times: General work shall be conducted Sunday through Saturday starting from 6:00 pm to 6:00 am. Utility interruptions shall be coordinated with the Owner's Representative one week in advance and shall be scheduled to occur between Friday 6:00 am and Monday 2:00 am. Construction access into warehouse space will require staff escort and shall be coordinated with Owner's Representative no less than 48 hours in advance. All dates and times will be outlined in the Project Schedule as required per Section 01 32 16 - Progress Schedule. Contractor will notify Owner's Representative when changes to the submitted working days/hours are deemed necessary. PN - L19021 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |