Similar Projects
Tractor Supply
New Construction - 35,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bradford, VT

Cabot Resource Recovery Facility
New Construction
Conception
Cabot, VT 01842

Retreat Farm Expansion
New Construction, Renovation - 50,000 SF
Design
$15,000,000 est. value
Brattleboro, VT 05301

Landscaping Offices
New Construction - 14,694 SF
Design
$30,000 est. value
South Burlington, VT 05403

Sheds
Post-Bid
$6,500 est. value
Shaftsbury, VT 05262

Flat Street Mixed Use
New Construction, Addition - 16,000 SF
Post-Bid
Brattleboro, VT

Salt Shed STP MM19(1)
Results
$500,000 to $1,000,000 est. value
Saint Albans, VT

Transfer Station Pole Barn / Lean to
Results
Castleton, VT

Shelburne Green South
New Construction, Renovation - 70,600 SF
Construction
$3,029,100 est. value
Shelburne, VT 05482

FedEx Ground Distribution Facility
New Construction - 182,000 SF
Construction
$19,548,843 est. value
South Burlington, VT 05403

Fleetpride Truck & Trailer Parts Expansion
Addition - 9,632 SF
Pending Verification
Williston, VT 05495

Traverse Place Warehouse
New Construction
Pending Verification
Rutland, VT 05701

Darn Tough Socks
Build-Out - 72,000 SF
Conception
Waterbury, VT 05676

Industrial Park
New Construction - 15,000 SF
Design
$1,210,000 est. value
Saint Albans, VT 05478

Northwoods Barn
New Construction - 1,296 SF
Post-Bid
Less than $500,000 CJ est. value
East Charleston, VT 05833

Last Updated 03/18/2021 04:32 PM
Project Title

DFA Winter

Physical Address View project details and contacts
City, State (County) Saint Albans, VT 05478   (Franklin County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Warehouse/Storage
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced July 2020, Construction Nearing Completion, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Manufacturing/Processing Plant, Renovation, Warehouse/Storage, 10,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents