Similar Projects
MIT Kendall Square Initiative - SoMa
New Construction, Demolition - 1,416,600 SF
Construction
$10,000,000 CJ est. value
Cambridge, MA 02138

Columbus Avenue Student Housing
New Construction - 320,000 SF
Construction
Roxbury, MA 02120

Soldiers Field Housing Complex
Renovation - 429,000 SF
Construction
$183,500,000 est. value
Allston, MA 02163

Boylston Place
New Construction - 226,700 SF
Design
$1,000,000,000 est. value
Boston, MA

840 Columbus Avenue
New Construction - 525,000 SF
Pending Verification
$10,000,000 CJ est. value
Boston, MA 02120

630 Huntington Avenue
New Construction - 102,000 SF
Pending Verification
Mission Hill, MA

Repair Building 15 TT Barracks East Wing
Renovation
Post-Bid
Natick, MA

Open Sky Community
New Construction - 11,300 SF
Design
$10,000,000 CJ est. value
Worcester, MA 01603

MIT West Campus Graduate Dormitory
New Construction - 654,000 SF
Pending Verification
$10,000,000 CJ est. value
Cambridge, MA 02139

May Hall Envelope and Roof Repairs - Filed Sub Bids
Alteration
Results
$325,000 est. value
Framingham, MA 01702

Westmoor Club - Dorm B
New Construction
Pending Verification
Nantucket, MA 02554

Westmoor Club - Dorm A
New Construction
Pending Verification
Nantucket, MA 02554

Last Updated 06/30/2021 09:20 AM
Project Title

May Hall Envelope and Roof Repairs - General Bids

Physical Address View project details and contacts
City, State (County) Framingham, MA 01702   (Middlesex County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $418,781
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The Project consists of: Demolition and rebuilding of wood-framed roof structure at the two western stair towers of May Hall. Project also includes removal of four downleaders and repointing masonry 2'-8" either side of the downleader; installation of new downleader. There is some abatement at the sill of the existing gutter.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents