Similar Projects
Fairfield Inn by Marriott / Astoria
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Astoria, OR 97103

Bandon Beach Hotel
Demolition, New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bandon, OR 97411

PacifiCorp Service Center Juniper Ridge (JRSC)
LEED Certification, New Construction - 69,500 SF
Design
$184,000,000 CJ est. value
Bend, OR 97709

Pegasus Equestrian-Centered Resort
New Construction
Conception
$90,000,000 est. value
Oakland, OR 97462

Home2 Suites By Hilton / Medford
New Construction, Infrastructure - 72,820 SF
Pending Verification
$22,000,000 CJ est. value
Medford, OR 97504

Portland Proper Hotel
New Construction, Infrastructure - 170,000 SF
Design
$50,000,000 CJ est. value
Portland, OR 97209

Block 216/Ritz Carlton
New Construction - 1,100,000 SF
Design
$600,000,000 est. value
Portland, OR 97205

Riverplace Phase I
New Construction, Infrastructure - 400,000 SF
Pending Verification
$124,000,000 CJ est. value
Portland, OR 97201

Holladay Street Hotel Renovation
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Portland, OR 97232

Schmeer Road Hotel / Portland
New Construction, Infrastructure - 120,358 SF
Design
$25,000,000 CJ est. value
Portland, OR 97217

Cambria Hotel Portland
New Construction, Infrastructure - 95,700 SF
Design
$28,000,000 CJ est. value
Portland, OR 97209

Hotel & Restaurant
Renovation
Design
$20,000,000 CJ est. value
Portland, OR 97209

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Fairfield Inn & Suites by Marriott / Newberg
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Newberg, OR 97132

Last Updated 09/23/2022 11:46 AM
Project Title

Arbor Lodge Family Shelter Renovations

Physical Address View project details and contacts
City, State (County) Portland, OR 97217   (Multnomah County)
Category(s) Commercial, Green Building
Sub-Category(s) Hotel/Motel, LEED Certified
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $7,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Submission Close Date 9/12/2022 2:00 PM PDT All questions in regards to the Sourcing Event must be submitted through the Q & A board. PREQUALIFICATION All persons desiring to bid for contracts requiring prequalification shall submit a completed prequalification application to the Multnomah County Purchasing office email to prequal@multco.us. Such statements MUST be received at least 10 days prior to the date that bids are due. Bidders are required to pre-qualify in the required class of work for at least the amount of the project estimate. Failure to do so shall result in rejection of bid. If you feel you are already prequalified in the correct class(es) of work and dollar amount, please contact prequal@multco.us to confirm prior to the 10 day deadline listed above. Pre-qualification - Complete and submit the Prequalification Application Form for the following class(es) of work: (1) Building Alteration and Repair (2) Building Construction PREVAILING WAGE : Do apply to this Contract. The wage rates to be paid are set forth in Prevailing Wage Rates on Public Works Contracts in Oregon, which is incorporated by reference. Copies are available from any office of the Wage and Hour Division of the Bureau of Labor and Industries. Copies are also available on the bureau portal. Current Prevailing wage rate: Effective July 1, 2022. Bidders may also request a copy of the Prevailing Wage Rates and rules by calling the Bureau of Labor and Industries at (971) 673-0838. The Engineer's project estimate is Between $6,500,000 - $7,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. BID BOND : A Bid Bond will be required for this solicitation. PERFORMANCE AND PAYMENT BONDS : Performance and payment bonds will be required for this contract. CONTRACT AWARD : As a result of this sourcing event process, Multnomah County intends to award a single contract to the lowest bidder who meet minimum requirements. The award will be made on lowest line item bid price for Group S1: S1.1 Total Renovation Costs Group 2: Bid Alternates and Group 3: Unit prices WILL NOT be used to determine low bidder. B558 - P78 CF 1001720

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents