Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Jupiter Inlet Lighthouse Septic to Sewer Conversion
Infrastructure
Bidding
Loxahatchee, FL

Septic System Repair and Replacement
Infrastructure
Bidding
FL

Septic Services
Term Contract
Post-Bid
Miami, FL

Harbour Drive Force Main Replacement
Post-Bid
Naples, FL 34103

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Cedar Bay District II Pump Stations and Flow Rerouting Project - Robena Road
Construction
Jacksonville, FL 32218

Bridgeford Oaks Lift Station Rehabilitation
Construction
$225,000 est. value
Tampa, FL 33637

One Year Contract for Cleaning and TV of Small Diameter Pipes in PS Basin 0002
Term Contract
Bidding
$1,338,635 est. value
FL

Deep Injection Well Pump Station Coating
New Construction
Post-Bid
North Port, FL 34287

Relocation of Lift Station #1
Results
Newberry, FL 32699

Lift Station No. 20 Replacement
Renovation
Construction
$1,737,000 est. value
Palm Beach Gardens, FL

Sanitary Sewer Interceptor Rehabilitation
Infrastructure
Bidding
$2,013,043 est. value
FL

Pleasant Grove Fire Station
Infrastructure
Post-Bid
Pensacola, FL 32507

Last Updated 02/17/2022 10:23 AM
Project Title

North Hutchinson Island Septic to Sewer Project Phase I - Jackson Way

Physical Address View project details and contacts
City, State (County) FL   (Saint Lucie County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of one lift station, 1,500 feet of gravity sewer main and 1,600 feet of force main with all associated appurtenances for the full and complete construction of the system as shown on the construction drawings and as permitted per County standards.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents