Similar Projects
Tampa Union Station RTU-7 AC Replacement
Post-Bid
Tampa, FL 33602

Replace Air Conditioning Unit at Parks Administration Building
Post-Bid
Plant City, FL 33563

FDOT HVAC Install: Sneads WB Weigh Station
Results

HVAC Direct Digital Control System Service
Term Contract
Results
Less than $55,000 est. value
FL

RTU-2 Rooftop Unit Installation, TSS Building E
Post-Bid
Tampa, FL 33605

HVAC System and Repair (Supplemental Vendors)
Term Contract
Results
Less than $5,000 est. value
Tampa, FL 33601

HVAC Cooling Tower Replacement
Post-Bid
Tampa, FL 33600

Furnish and Install AC Units at Utilities Administration Building
Results
Plant City, FL

HVAC Redundancy at Palm Terrace Assisted Living Facility and Adult Day Care Facility
Post-Bid
Tampa, FL 33617

Citywide HVAC Services
Term Contract
Results
Tampa, FL 33602

Airside F Air Handler Replacement
Post-Bid
Tampa, FL 33607

4420--Supply: Repair Heater Exchanger Repair and Installation
Results
Tampa, FL

Hvac Preventative Maintenance Services
Post-Bid
Clewiston, Fort Pierce, Hollywood, Immokalee, Naples, Okeechobee, Tampa, FL 33024

J065--FY-20 Chiller Maintenance at the James A. Haley Vetrans Hospital Tampa FL
Results
Tampa, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Reported 03/27/2021 12:00 AM
Project Title

Davidsen Middle School HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Tampa, FL 33626   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the partial HVAC upgrades including replacement of the pumping airside and controls, air handlers, VAVs, Fan Coil Units, Exhaust Fans and Duct Heaters. The Chiller Pumps will remain and undergo preventive maintenance on the impellers. The two existing chillers that were replaced in 2012 will remain. In addition the fire alarm system will be replaced and the improvements to the existing stage lighting.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents