Similar Projects
Pineapple Complete Streets Project
Post-Bid
$1,119,730 est. value
Melbourne, FL 32935

Front Street Complete Streets Project
Post-Bid
Melbourne, FL 32901

Milling / Resurfacing / Widening
Results
Less than $838,432 est. value
FL

Road Bond Paving Units 11, 15, 18, 23 and 56
Results
$10,010,151 est. value
Palm Bay, FL 32907

Paving IDIQ, CCSFS
Post-Bid
Cape Canaveral, FL 32925

Add Left Turn Lane(S)
Results
Less than $1,404,706 est. value
FL

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

Economic Development Transportation Project Fund (EDTPF) Infrastructure Improvements Roadway Package
Results
Cape Canaveral, FL 32920

Asphalt Construction, Sealing & Striping
Post-Bid
$300,000 est. value
FL

CDBG Paving Improvements Project FY 19/20
Results
Titusville, FL 32781

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Emergency Roadside Assistance Services (I-95)
Results

FPL Cocoa Service Center Paving Improvements
Alteration
Post-Bid
Cocoa, FL 32922

Emergency Roadside Assistance Services (SR 528)
Results

St Johns Heritage Parkway (SJHP) Phase 1 and 2 Babcock Connection and Left Turn Lane
Results
$272,436 est. value
Palm Bay, FL 32907

Last Updated 09/23/2021 09:46 AM
Project Title

Road Bond Paving - Kirby Industrial Park and Palm Bay Colony

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32905   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,052,355
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of 1.5" mill & pave of streets in Kirby Industrial Park, full depth reclamation (FDR) of Danr Drive NE and 1" mill and pave of streets within Palm Bay Colony. The roadway improvements include FDR of Danr Drive NE with emulsion and cement and then all other streets are 1" or 1.5" milling and paving of the entire two travel lanes. All streets are within the City of Palm Bay Right of Way. Construction shall include all incidental items for work to be performed as per the construction plans for the roadways including FDR, milling and paving, removing and replacing sidewalks for ADA additions, installing truncated domes, temporary striping, final thermoplastic striping and pavement markings. The awarded contractor shall furnish and install all construction work identified on the plans per the specifications identified herein. While not intended to be an all-inclusive list, work shall include the following items: mobilization, erosion control, testing of all items per FDOT requirements and per the bid specification, milling pavement, hauling of millings to City Site at 1750 Main Street, edge grading, shoulder restoration, slope crown correction, leveling course of asphalt, temporary and final thermoplastic striping, pavement markings, reflective pavement markings, sodding, traffic coordination, maintenance of traffic plan

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents