Similar Projects
Galbraith Road Bridge Over Anthony Wayne Avenu and NS Railway
Post-Bid
Cincinnati, OH 45202

Cordell Drive Bridge Reconstruction Project
Post-Bid
$445,000 est. value
Dayton, OH 45422

Western Campus Tunnel Removal and Presser Hall Bridge Rehabilitation
Results
Less than $1,435,000 est. value
Oxford, OH

Box Beam Replacement Program
Results
Less than $680,000 est. value
Cleveland, OH

Renovate the Pedestrian Garage Bridge, West Sinclair Community College
Post-Bid
Less than $2,175,000 est. value
Dayton, OH

Bridge Replacement - CR 38 over Wolf Creek
Results
Less than $618,125 est. value
Tiffin, OH

Bridge Repair - BH FY19 (A)
Results

Prestressed Concrete Box Beam
Results
Less than $92,925 est. value
Hillsboro, OH

Bridge Repair - SR 39-09.70
Results
OH

Bridge 24G.2 Replacement
Results
Less than $270,133 est. value
Wauseon, OH 43567

Joe`s Run - Phase 2 Recreational Trail Bridge
Results
Less than $425,000 est. value
Zanesville, OH 43702

2019 Box Beams
Results
Wilmington, OH 45177

HAN-TR 150- 4.53 Bridge Rehabilitation
Results
Less than $438,000 est. value
Findlay, OH 45840

Lily Drive Bridge 1023-0.17 Replacement Project
Results
Less than $298,000 est. value
OH

John Bryan State Park Lower Bridge Replacement
Results
Less than $232,080 est. value
Yellow Springs, OH

Last Updated 02/14/2020 05:42 AM
Project Title

Bridge Repair - IR 77-20.16/Tus-US 250-18.90

Physical Address View project details and contacts
City, State (County) Dover, New Philadelphia, OH   (Tuscarawas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improving Various Sections In The Cities Of Dover And New Philadelphia, Townships Of Dover And Goshen, In Tuscarawas County, Ohio, In Accordance With Plans And Specifications By Placing An Asphalt Wearing Surface On Several Structures With Polymer Modified Asphalt Expansion Joints, Performing Scupper Modifications, And All Related Work. Section 0001 Roadway Line Alt Item Code Item Description Wt Unit Quantity 0001 202e23500 Wearing Course Removed (Wt: Nr) Nr Sy 15,372.000 0002 202e23501 Wearing Course Removed, As Per Plan (a) (Wt: Nr) Nr Sy 560.000 0003 202e23501 Wearing Course Removed, As Per Plan (b) (Wt: Nr) Nr Sy 926.000 0004 209e60500 Linear Grading (Wt: 06) 06 Mile 1.280 Section Line Item Code Item Description Unit Quantity 0002 Erosion Control 0005 832e30000 Erosion Control (Wt: 08) 08 Each 1,000.000 Section 0003 Pavement Line Alt Item Code Item Description Wt Unit Quantity 0006 407e10000 Tack Coat (Wt: 10) 10 Gal 4,194.000 0007 408e10001 Prime Coat, As Per Plan (Wt: 10) 10 Gal 598.000 0008 442e20051 Asphalt Concrete Surface Course, 12.5 Mm, Type b (448), As Per Cy 2,651.000 Plan, (Pg70-22m) (Wt: 10) 10 0009 617e10100 Compacted Aggregate (Wt: 06) 06 Cy 148.000 0010 617e20000 Shoulder Preparation (Wt: 06) 06 Sy 94.000 0011 618e40600 Rumble Strips, Shoulder (Asphalt Concrete) (Wt: Nr) Nr Mile 2.480 Section 0004 Traffic Control Line Alt Item Code Item Description Wt Unit Quantity 0012 621e00100 Rpm (Wt: 41) 41 Each 95.000 0013 621e54000 Raised Pavement Marker Removed (Wt: Nr) Nr Each 95.000 0014 646e10010 Edge Line, 6" (Wt: 45) 45 Mile 2.800 0015 646e10110 Lane Line, 6" (Wt: 45) 45 Mile 1.220 0016 646e10200 Center Line (Wt: 45) 45 Mile 0.100 0017 646e10310 Channelizing Line, 12" (Wt: 45) 45 Ft 1,240.000 0018 646e20504 Dotted Line, 6" (Wt: 45) 45 Ft 100.000 Section 0005 Maintenance Of Traffic Line Alt Item Code Item Description Wt Unit Quantity 0019 614e11110 Law Enforcement Officer With Patrol Car For Assistance (Wt: 39) 39 Hour 200.000 0020 614e12460 Work Zone Marking Sign (Wt: 39) 39 Each 24.000 0021 614e12484 Work Zone Increased Penalties Sign (Wt: 39) 39 Each 8.000 0022 614e18601 Portable Changeable Message Sign, As Per Plan (Wt: 39) 39 Snmt 12.000 0023 614e20210 Work Zone Lane Line, Class i, 6", 740.06, Type i (Wt: 39) 39 Mile 2.440 0024 614e21200 Work Zone Center Line, Class i, 740.06, Type i (Wt: 39) 39 Mile 0.200 0025 614e22210 Work Zone Edge Line, Class i, 6", 740.06, Type i (Wt: 39) 39 Mile 2.600 0026 614e23400 Work Zone Channelizing Line, Class i, 8", 740.06, Type i (Wt: 39) 39 Ft 2,480.000 0027 615e25001 Pavement For Maintaining Traffic, Class b, As Per Plan (Wt: 10) 10 Sy 150.000 0028 808e18700 Digital Speed Limit (Dsl) Sign Assembly (Wt: 39) 39 Snmt 24.000 Section 0006 Structure Repair (Tus-77-2018l, Sfn: 7902794) Line Alt Item Code Item Description Wt Unit Quantity 0029 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 14.000 Section 0007 Structure Repair (Tus-77-2018r, Sfn: 7902794824) Line Alt Item Code Item Description Wt Unit Quantity 0030 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 14.000 Section 0008 Structure Repair (Tus-77-2089l, Sfn: 7902883) Line Alt Item Code Item Description Wt Unit Quantity 0031 518e12801 Scupper, Modification, As Per Plan (a) (Wt: 29) 29 Each 16.000 0032 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 34.000 27) 27 Section 0009 Structure Repair (Tus-77-2089r, Sfn: 7902913) Line Alt Item Code Item Description Wt Unit Quantity 0033 518e12801 Scupper, Modification, As Per Plan (a) (Wt: 29) 29 Each 16.000 0034 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 54.000 27) 27 Section 0010 Structure Repair (Tus-77-2195l, Sfn: 7902972) Line Alt Item Code Item Description Wt Unit Quantity 0035 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 51.000 0036 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 60.000 27) Section 0011 Structure Repair (Tus-77-2195r, Sfn: 7903006) Line Alt Item Code Item Description Wt Unit Quantity 0037 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 48.000 0038 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 60.000 27) 27 Section 0012 Structure Repair (Tus-77-2217l, Sfn: 7903030) Line Alt Item Code Item Description Wt Unit Quantity 0039 518e12801 Scupper, Modification, As Per Plan (a) (Wt: 29) 29 Each 22.000 0040 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 36.000 27) 27 Section 0013 Structure Repair (Tus-77-2217r, Sfn: 7903065) Line Item Code Item Description Unit Quantity 0041 518e12801 Scupper, Modification, As Per Plan (a) (Wt: 29) 29 Each 22.000 0042 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 36.000 27) 27 Section 0014 Structure Repair (Tus-77-2235l, Sfn: 7903154) Line Alt Item Code Item Description Wt Unit Quantity 0043 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 14.000 Section 0015 Structure Repair (Tus-77-2235r, Sfn: 7903189) Line Alt Item Code Item Description Wt Unit Quantity 0044 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 10.000 Section 0016 Structure Repair (Tus-77-2337l, Sfn: 7903243) Line Alt Item Code Item Description Wt Unit Quantity 0045 518e12801 Scupper, Modification, As Per Plan (a) (Wt: 29) 29 Each 10.000 0046 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 42.000 27) 27 Section 0017 Structure Repair (Tus-77-2337r, Sfn: 7903278) Line Alt Item Code Item Description Wt Unit Quantity 0047 518e12801 Scupper, Modification, As Per Plan (a) (Wt: 29) 29 Each 10.000 0048 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 42.000 27) 27 Section 0018 Structure Repair (Tus-77-2361l, Sfn: 7903308) Line Alt Item Code Item Description Wt Unit Quantity 0049 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 19.000 Line Alt Item Code Item Description Wt Unit Quantity 0019 Structure Repair (Tus-77-2361r, Sfn: 7903332) 0050 518e12801 Scupper, Modification, As Per Plan (b) (Wt: 29) 29 Each 19.000 Section 0020 Structure Repair (Tus-250-1890, Sfn: 7905165) Line Alt Item Code Item Description Wt Unit Quantity 0051 518e12801 Scupper, Modification, As Per Plan (c) (Wt: 29) 29 Each 8.000 0052 518e62100 Structure Drainage, Misc.:Existing Gutter Cleanout (Wt: Nr) Nr Ft 432.000 0053 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 28.000 27) 27 Section 0021 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0054 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0055 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0056 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents