Similar Projects
Museum of Shenandoah Valley Trails
Post-Bid
Winchester, VA 22601

Main Street Enhancement Project
Post-Bid
$10,000 est. value
Orange, VA

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Parking and Drive Extension
Results
VA

West Great Neck Road Sidewalk
Post-Bid
Virginia Beach, VA

Pedestrian and Drainage Project
Results
$4,467,755 est. value
Fairfax, VA

Sidewalk Trip Hazard Removal
Term Contract
Post-Bid
Buchanan, VA 24066

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Driveway, Slope and Grade Repair-Culpeper
Post-Bid
Culpeper, VA 22701

State HQ Modernization Parking Lot Extension
Results
Richmond, VA 23297

Parking Area Upgrades
Post-Bid
Tasley, VA

Matthew Whaley Elementary School Parking Lot Improvements Project
Results
$472,304 est. value
Williamsburg, VA 23185

Z--Sidewalk Replacement
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Site Repairs and Improvements
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

FY 20 Concrete Sidewalk, Sidewalk Through Entrance, Curb, Curb and Gutter and Handicap Ramp Removal/Replacement
Post-Bid
Roanoke, VA 24011

Last Updated 11/21/2019 04:12 PM
Project Title

Construction of the Round Hill to Franklin Park Trail and Main Street Projects

Physical Address View project details and contacts
City, State (County) Round Hill, VA 20141   (Loudoun County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of two (2) enhancement projects with VDOT project numbers of EN00-053-162(UPC 56454) and EN08-291-131(UPC 91248), respectively. The purpose of EN00-053-162(UPC 56454) is to install curb and sidewalk on both sides of East Loudoun Street (Business Route 7) from the intersection of North Main Street (Route 719) to the eastern Town limits (approximately 1,720 linear feet) and to install a 10’ shared use path between the Lake Point Subdivision and the Franklin Park ice skating rink (approximately 3,340 linear feet). The purpose of EN08-291-131(UPC 91248) is to install sidewalk from the intersection of East Loudoun Street to 35 North Main Street (approximately 1,260 linear feet) for the entire length on the east side of North Main Street and for a partial length on the west side of the street. This Project includes, but is not limited to: clearing and grubbing, excavation including rock excavation, asphalt paving, storm sewer construction, installation of erosion and sediment control measures, maintenance of traffic, the grading and reconnection of private entrances, fence replacement, installation of temporary and permanent signage, pavement markings, retaining wall modification/construction, and waterline relocation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents