Similar Projects
Gold-Replace Constant Temperature Cooling System
Alteration
Bidding
Less than $600,000 est. value
CO

F--Air Duct Cleaning BPA
Term Contract
Bidding
Boulder, CO - Las Vegas, NV

CP291773 - Camp - CHW Plant Enhancement Project
Post-Bid
Less than $5,000,000 est. value
Boulder, CO 80303

Temporary Classrooms Heating/AC Unit Replacement
Post-Bid
Garden City, CO 80631

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Replace Chiller, McKee Hall
Results
Greeley, CO 80639

Cooling Tower Cold Water Basin Repair - Centennial Center
Alteration
Bidding
Greeley, CO 80631

HVAC Services
Post-Bid
Less than $50,000 est. value
Greeley, CO 80631

Replacement HVAC System
Results
Windsor, CO 80550

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Chillers/Cooling Tower Replacement
Results
Greeley, CO

HVAC and Mechanical Products
Term Contract
Post-Bid

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Annual Maintenance - HVAC Services Including Repair and Maintenance
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Last Updated 12/09/2021 03:26 AM
Project Title

Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Longmont, CO 80504 (Boulder, Weld Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids from qualified contractors, for the removal of existing cooling tower and installation of a new Owner furnished steel base and cooling tower at Coal Ridge Middle School. Construction Scope of Work: • Isolate and demo associated piping, electrical, and controls to facilitate removal of existing cooling tower. • Demo, removal, and disposal of existing EVAPCO model # AT 29-221 cooling tower. • Rework existing structural steel to accommodate new cooling tower steel base (OFCI). • Rework existing piping, electrical, and controls to accommodate the new cooling tower. • Provide and install cooling tower fan motor VFDs. • Load and haul new cooling tower (OFCI) from SVVSD facility to site. • Install new cooling tower (OFCI). • Reconnect all associated piping, electrical, and controls. • Facilitate startup and commissioning activity with the tower manufacturer.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents