Similar Projects
Shoulder Rework and Ditch Repair
Results
Less than $816,000 est. value
FL

Sun Land Citrus Trail Road Improvements and Culvert Replacement
Results
Less than $43,750 est. value
Eustis, FL

Hilochee Phase 2 - Structure Replacement
Results
Less than $365,000 est. value
Clermont, FL 34714

Lakeview Drive Drainage Improvement
Results
Less than $83,136 est. value
Tavares, FL 32778

Lake Yale Marsh Park Stormwater Project
Results
Less than $155,077 est. value
Eustis, FL

Alexander Springs Run (Bank Stabilization)
Results
Less than $130,000 est. value
FL

District No. 10 Wetland 88 Equalization Transfer Pipe
Results
The Villages, FL

Shoulder and Utility Strip Rework
Results
Less than $89,000,000 est. value

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Drainage Repair
Results
Less than $670,500 est. value

Road, Drainage, and Sidewalk Construction Job Order Contract, Projects
Results
Less than $200,000 est. value
Tavares, FL 32778

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Wolf Branch Sink Drainage Improvements
Results
Less than $279,364 est. value
Mount Dora, FL

CR 466A Phase 3B Pond 4
Results
Tavares, FL 32778

Shoulder Rework and Culvert Pipe Desilt
Results
Less than $1,110,675 est. value
FL

Last Updated 07/06/2021 09:11 AM
Project Title

Polypropylene Pipe/HDPE Pipe

Physical Address View project details and contacts
City, State (County) FL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $28,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Twenty linear foot sections of Polypropylene/HDPE Pipe in accordance with attached specifications: - 5 – 12” - 8 – 15” - 15 – 18” - 15 – 24” - 5 – 30” - 5 – 36” The price shall include freight/shipping fees. The hauler shall have the equipment available to unload the items.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents