Last Updated 09/14/2021 12:14 PM
Project Title

Route 202A Water Main Extension and Storage Tank

Physical Address View project details and contacts
City, State (County) Rochester, NH   (Strafford County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of constructing approximately 13,000 linear feet of 12-inch and 8,000 linear feet of 8-inch ductile iron water main and appurtenances along NHDOT Route 202A, Bickford Rd., Winkley Farm Ln., and Fiddlehead Ln. The project will involve installation of a 256,000 gallon composite elevated water storage tank, an automatic flushing system, an elevated bridge/stream crossing, and a meter vault.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents