Similar Projects
Opheim Mainline Project Schedule 4 - Pump Station and GSR
Infrastructure
Results
$3,900,000 est. value
Opheim, MT

Falcon Hollow Well - 2
Infrastructure
Post-Bid
Bozeman, MT

Replace Pump Station and Drain field
Term Contract
Design
$250,000 to $500,000 est. value
Wisdom, MT 59761

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Kalispell Wells Project
Infrastructure
Post-Bid
Kalispell, MT

Municipal Groundwater Test Wells Project
Infrastructure
Post-Bid
Bozeman, MT 59715

Leon Johnson Hall Redundant Heat Pump Module Installation
Renovation, Infrastructure
Post-Bid
Bozeman, MT 59717

MBMG Blackfeet Well Drilling
Infrastructure
Post-Bid
Butte, MT

I-94 - Custer Replacement Well
Infrastructure
Bidding
Custer, MT

Beaverhead Deerlodge National Forest - Flint Creek Campground Well Drilling
Term Contract
Post-Bid
Philipsburg, MT 59858

Water Supply Replacement Well
Infrastructure
Bidding
Deer Lodge, MT

New Wellhouse and Mainline Construction Project
Alteration
Post-Bid
MT

Kalispell Upper Zone Wells Project
Alteration
Results
$578,250 est. value
Kalispell, MT

Install Dewatering System at Lf D-2 Synopsis
Term Contract
Design
Malmstrom AFB, MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Last Updated 03/08/2022 05:43 PM
Project Title

Construction of the East Helena Water Source Improvements 2022

Physical Address View project details and contacts
City, State (County) East Helena, MT   (Lewis and Clark County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes the following: Schedule I: Includes improvements at the East Helena Radial Wells. The improvements include removing the existing submersible turbine pumps and appurtenances and installing new vertical turbine pumps and appurtenances at Radial Well 1 and Radial Well 2. The new pumps will be housed in new CMU buildings at both radial wells. The improvements also include installing a pedestrian bridge across McClellan Creek. Schedule II: Includes the construction of a new wellhouse and installing pumps, pipes, and appurtenances. The well will be drilled in February 2022, prior to this project. The new wellhouse (Wylie Well #4) will be constructed on City property on the East side of Wylie Drive, south of Raghorn Drive. Wellhouse construction shall include erecting a new CMU building and installing a new vertical turbine pump, transmission main, appurtenances, and other site and building tasks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents