Similar Projects
Rooftop Gas Fired Makeup Air Units Replacement
Alteration
Bidding
$130,000 est. value
Medford, MA

On-Call HVAC Services
Alteration
Bidding
Malden, MA

HVAC Air System Rebalancing
Post-Bid
$150,000 est. value
Chelmsford, MA

Barbieri Warehouse Rooftop Unit
Post-Bid
$300,000 est. value
Framingham, MA

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Tsongas HVAC Units Replacement - General Bid
Alteration
Bidding
$7,450,000 est. value
Lowell, MA 01852

Air Vent Cleaning of Aviation Hangars
Post-Bid

Watertown Police Department Firing Range HVAC Upgrades - General Bids
Results
Less than $450,000 est. value
Watertown, MA

HVAC Maintenance and Support Services
Alteration
Bidding
Billerica, MA

HVAC and Mechanical Products
Term Contract
Post-Bid

Watertown Police Department Firing Range HVAC Upgrades - Filed Sub Bids
Results
$425,000 est. value
Watertown, MA 02472

HVAC Repair and Maintenance
Term Contract
Bidding
Lowell, MA

Chiller System Replacements at the Innovation Academy
Post-Bid
Tyngsborough, MA 01879

Mercier Center HVAC Renovation
Results
Less than $58,500 est. value
Lowell, MA 01854

Last Updated 06/15/2022 12:17 AM
Project Title

New Kitchen Range Hoods, Musketahquid Village 667-1 - General Bid

Physical Address View project details and contacts
City, State (County) Sudbury, MA 01776   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $221,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

667-1 Hood Fan Installation SUST Request Kitchen Ventilation Upgrade,DCAMM Certification: HVAC 1. The Project consists of: Upgrade Kitchen Ventilation: Install new kitchen hoods at Apartments at Musketahquid Village 667-01 Housing Development. Asbestos Remediation will be part of this project. The Construction performance period is 70 calendar days. 2. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents