Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Dittrich Street Flood Pump Station Reconstruction
Infrastructure, Renovation
Bidding
$338,000 CJ est. value
Endwell, NY 13760

Dittrich Street Flood Pump Station Reconstruction
Infrastructure, Renovation
Bidding
$338,000 CJ est. value
Endwell, NY 13760

Mountainview Recreation Court Fencing
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Binghamton, NY 13902

Cleaning of Leachate Holding Tanks and Television Inspection Program
Term Contract
Sub-Bidding
Binghamton, NY 13905

Material Bid Smith Drive Water Main Reconstruction
Infrastructure
Post-Bid
Endwell, NY 13760

Water Main Reconstruction on Smith Drive Between Byford Boulevard and Hooper Road
Infrastructure
Post-Bid
Endwell, NY 13760

Water Meters and Parts
Term Contract
Results
Binghamton, NY

Asbestos Demolition, Site Clearing and Site Restoration
Demolition, Infrastructure
Results
Binghamton, Harpursville, Kirkwood, NY 13787

Glidepath Battery Storage Facility
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Endwell, NY 13760

2022 Sanitary Sewer and Water Main Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Binghamton, NY 13905

Storm Drainage Piping Materials
Term Contract
Sub-Bidding
Johnson City, NY 13790

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Water Main Replacement Avenue A, B and C to Helen Drive
Infrastructure
Results
Johnson City, NY 13790

MacArthur Park Tennis Court Paving
Infrastructure
Bidding
$200,000 CJ est. value
Binghamton, NY 13903

Last Updated 08/08/2022 09:02 AM
Project Title

Town Hall Storm Water Control

Physical Address View project details and contacts
City, State (County) Town of Union, NY 13760   (Broome County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

It is the Contractor's responsibility to meet the minimum guidelines of the Manual On Uniform Traffic Control Devices (MUTCD) and the Occupational Safety and Health Act (O.S.H.A), in particular Part 1926, the Safety and Health Regulations for Construction. The Town of Union Safety Officer has the authority to issue a Stop Work Order if the applicable MUTCD or O.S.H.A. regulations are violated. The Stop Work Order will remain in effect until such violations of the MUTCD or O.S.H.A. regulations have been rectified. A bid guarantee in the form of cash, certified check or bid bond in the amount of ten percent (10%) of the proposal will be required of all bidders. The Town Board reserves the right to reject any and all bids and to re-advertise for bids at its discretion.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents