Similar Projects
Holly Acres Estates
Renovation, Alteration
Bidding
Erie, PA 16509

Williamsport Region Relief Well Rehabilitation and Replacement Project
Infrastructure
Bidding
Williamsport, PA

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Sanitary Sump Pump Replacement at Mellon Square Garage
Post-Bid
Pittsburgh, PA 15222

Water Pollution Control Plant and Pump Station Improvements
Results
Jamestown, PA 16134

Fords Corner Area Wastewater System Extension (Contracts 1-2)
Results
Johnstown, PA 15901

Dean Pumps
Infrastructure
Bidding
PA

Well No. 3 Replacement Well Drilling, Construction, and Aquifer Testing
Infrastructure
Post-Bid
Saltillo, PA

Glannons Pump Station and Force Main Upgrade - General/Mechanical Construction
Results
Allison Park, PA 15101

Fuel Pump Maintenance
Infrastructure
Bidding
Philadelphia, PA

Turbine Pump for Water Treatment Plant
Post-Bid
PA

Middle School Pump Station Upgrade
Results
Conneaut Lake, PA 16316

Sprinkler Piping & Fire Pump Modifications General Construction
Infrastructure
Bidding
Media, Philadelphia, PA 19063

Pressure Sewer Construction and Grinder Pump Installation
Post-Bid
Grove City, PA

Cleaning Out and Plugging One (1) Abandoned Well, Mill Creek Township, Lycoming County
Results
$100,000 to $200,000 est. value
PA

Reported 03/08/2022 12:00 AM
Project Title

Valve Replacement & Repair

Physical Address View project details and contacts
City, State (County) Willow Grove, PA 19090   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

LI 001: BLDG 10 (Water Treatment Facility) Remove, inspect, rebuild and reinstall the two existing Peerless 4-inch turbine water pumps. Minimize disruption to water service during this work by working on one pump at a time. Repairs/rebuilds may include new bearings, seals, packing and anything else determined to be needed. Once rebuilt, reinstall and test each pump for proper operation., 1, JA; LI 002: Interconnection Vault Replace the existing spool piece where the water line exits Building 10 and where the chlorination injection occurs. This line is corroded and does not have any ball valves to allow replacement of the chlorine injection site. Replace this spool piece with a new stainless steel (SS) spool piece with two injection quills and two new SS ball valves. Install spool piece through the wall and use a uniflange to bolt it to the existing 4-inch elbow outside Building 10. Fill around the wall penetration with foam and hydraulic cement. This task will be performed during off hours/down days to minimize disruption to base personnel., 1, JA; LI 003: Interconnection Vault Replace the existing 10-inch fire relief valve (Model Zurn ZW205FP) with a 10-inch pressure reducing valve (OCV Model 127-380X2F-190 or equivalent). Make all connections as needed for the new valve, check for leaks, and set the activation pressure as directed by ANG., 1, JA;

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents