Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Georgia 400
New Construction, Infrastructure - 907,550 SF
Conception
$90,000,000 CJ est. value
Cumming, GA 30040

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Brackley Residences
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Cumming, GA 30040

Widening and Reconstruction
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Cumming, GA 30040

Widening and Reconstruction
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Cumming, GA 30040

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Sawnee Drive Connector Road
Infrastructure
Post-Bid
Cumming, GA 30040

Repair/Replace Big Creek Greenway
Results
GA

2021 LMIG Project
Results
Mount Vernon, GA

Harbour Point Entrance
New Construction, Demolition
Construction
Gainesville, GA

Sawnee Mountain Preserve Sidewalk
Infrastructure
Bidding
$500,000 CJ est. value
Cumming, GA 30040

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Old Atlanta Highway Phase 4 and 5
Results
Cumming, GA

Renovations to various Parks and Trailhead Buildings within Forsyth County
Infrastructure
Bidding
$500,000 CJ est. value
Cumming, GA 30040

Last Updated 08/16/2022 11:02 AM
Project Title

Widening and Reconstruction on SR 9 (Atlanta Hwy)

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $35,072,944 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2.373 miles of widening and reconstruction on sr 9 (atlanta hwy) beginning at mcfarland rd (cr 458) and extending to post rd/mullinax rd. Counties: Forsyth District 1 - Gainesville, Area Office 1 - Gainesville ALL questions and comments must be submitted by the close of business of the Friday two weeks before the letting. All questions and comments received after the Friday before the week of the Letting will be documented, but a response will not be provided. For those contractors who are currently prequalified as a GDOT Construction Prequalified Contractor or Registered Subcontractor through GDOT's Construction Bidding Administration Office, and want to be prequalified to perform maintenance projects under the Routine Maintenance Services Program, there is now a modified prime contractors application form available. W e welcome you to participate. The application form and all applicable documents, resources and other guidance may be found on the GDOT website. Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or comments call (404) 631-1147 GADOT - 019 - Widening on US 23/SR 42 Beginning at Bill Gardner Project No.: 0007844 COMPLETE CONTRACT 6,983.00 Days

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents