Similar Projects
Bridgeland Prairieland Village Section 20 - Water, Non Potable Water, Drainage, Paving Improvements
Infrastructure
Bidding
$500,000 est. value
Houston, TX

Oak Park Storm Outfall and Park 8 Detention Pond
Infrastructure
Bidding
$200,000 est. value
Houston, TX

Elyson, Section Thirty Seven Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving
Post-Bid
TX

Storm Sewer, Water Line and Sanitary Sewer to Serve 6.38AC Commercial Development
Post-Bid
TX

Waterstone West Retail
Results
Houston, TX 77063

SH6 Driveways and Deceleration Lanes to serve Manvel Town Center
Results
Houston, TX

Excavation, Spoil Disposal and Stormwater Outfall
Infrastructure
Bidding
$600,000 est. value
Houston, TX

Construction of Proposed Waterline, Sanitary Sewer, Storm Sewer and Paving Improvements in Bridgeland Prairieland Village Section 8
Infrastructure
Post-Bid
TX

Construction of Storm Water Quality Retention Basin at John Paul Landing Park - North Basin Cell (Phase 1) for Harris County Precinct 3
Results
Less than $3,555,554 est. value
TX

Pillot Gully Outfall Repairs
Infrastructure
Bidding
$100,000 est. value
Houston, TX

Regional Detention Basin and Storm Sewer to Serve 71 Acre Townsen Development
Infrastructure
Post-Bid
Houston, TX

Construction of Water, Sanitary Sewer, Storm Sewer, and Paving to Serve Creekside Court
Results
TX

Construction at Lauder Stormwater Detention Basin (Phase 2 Compartment 1)
Infrastructure
Bidding
$260,000 est. value
Houston, TX

Storm Sewer, Sanitary Sewer and Water Lines to Serve Morton Creek Ranch Sections 24 and 26
Infrastructure
Post-Bid
TX

Dunham Pointe Model Court Section 1
Results
TX

Reported 06/07/2022 12:00 AM
Project Title

Storm Sewer Outfall Repairs throughout Various Locations for the Harris County Flood Control District

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Storm Sewer Outfall Repairs throughout Various Locations for the Harris County Flood Control District (For one (1) year beginning approximately August 1, 2022)

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents