Similar Projects
AutoZone #3618
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Tucson, AZ

Ulta Beauty at Target #700
Renovation - 1,000 SF
Design
Oro Valley, AZ 85737

Ulta Beauty at Target #1439
Renovation - 1,000 SF
Design
Tucson, AZ 85716

Walmart Supercenter #2922-240 - SPRB-R
Renovation - 207,542 SF
Bidding
Tucson, AZ 85741

Talavara Apartments - Phase I
Renovation - 72,998 SF
Sub-Bidding
$7,000,000 est. value
Tucson, AZ 85705

Nike Factory Store
Build-Out - 20,101 SF
Sub-Bidding
Tucson, AZ 85706

Fry`s #679-10
Renovation
Post-Bid
Sahuarita, AZ 85629

Fry's #689-08
Renovation
Post-Bid
Marana, AZ

Office of the Medical Examiner and Kino Parking Garage
New Construction - 34,000 SF
Results
$17,000,000 to $20,000,000 est. value
Tucson, AZ

5th and Dodge Apartment Renovation
Renovation
Results
$2,111,000 est. value
Tucson, AZ 85716

Newport At Amphi
New Construction, Demolition - 30,100 SF
Construction
$12,400,000 est. value
Tucson, AZ 85705

H.S. Lopez Family Foundation Center of Opportunity - Phase II - Alborada Apartments
New Construction - 68,106 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Tucson, AZ 85705

Ulta Beauty at Target #2140
Renovation - 1,000 SF
Design
Tucson, AZ 85705

Walmart Neighborhood Market #4264-213 - SPRB-R
Renovation - 41,679 SF
Post-Bid
Oro Valley, AZ 85704

Walmart Supercenter #5031-239 - SPRB-R
Renovation - 20,362 SF
Construction
Marana, AZ 85743

Last Updated 04/25/2022 04:43 PM
Project Title

Benedictine Monastery Apartments - Phase 1

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85716   (Pima County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Retail
Contracting Method
Project Status Construction Commenced January 2020, Construction Complete as of October 2021
Bids Due View project details and contacts
Estimated Value $60,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 7,500 SF New Construction, 2 Apartments/Condominiums, 5 Stories Above Grade 255 Unit(s), Parking Garage.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Electric Traction Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents