Similar Projects
Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

SGR - Bridge Rehabilitation
Results
Less than $1,854,000 est. value
VA

SGR - Bridge Replacement Over Colvin Run
Results
$4,789,000 est. value
VA

Wiehle Avenue at Washington and Old Dominion Trail Project
New Construction, Infrastructure
Post-Bid
$200,000 est. value
Fairfax, VA

High Rise Bridge Bascule Safety Repairs
New Construction
Results
$1,451,000 est. value
VA

Benjamin Harrison Bridge Aerial Cable Installation
Renovation, Infrastructure
Post-Bid
$340,000 est. value
Disputanta, VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

SGR - Bridge Replacement Over Meadow Creek
New Construction, Infrastructure
Results
$2,293,000 est. value
VA

Superstructure Replacement
New Construction, Infrastructure
Results
$3,795,000 est. value
VA

Last Updated 07/06/2022 10:37 AM
Project Title

Dogwood Culvert - PWSTBG11 - City of Harrisonburg

Physical Address View project details and contacts
City, State (County) Harrisonburg, VA 22801   (Harrisonburg City County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing box culvert along Dogwood Drive between Hillandale Avenue and Cedar Street has developed a hole in the top surface. Public Works has temporarily placed a steel plate over the damaged section of box culvert and performed an engineering analysis of the structure. It has been determined that the box culvert should be replaced, as it has reached the end of its useful life. This project is in included in the City of Harrisonburg FY 2023-2027 Capital Improvement Plan (CIP). As of July 05, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents