Similar Projects
Y--Farmington Fire Facilities
New Construction
Design
$3,000,000 to $5,000,000 est. value
Farmington, NM

Police Facility Security and Demolition Project
New Construction
Post-Bid
Shiprock, NM 87420

New Fire Station
New Construction - 3,528 SF
Post-Bid
San Jon, NM

FY18 CNS Fire Department on the Northwest Development Area, Melrose Air Force Range, Roosevelt County, NM
New Construction - 8,562 SF
Results
$1,000,000 to $5,000,000 est. value
Floyd, NM 88118

Sullivan Road Fire Station District 9 Renovations
Renovation
Results
Less than $209,000 est. value
Bloomfield, NM 87413

New Fire Station
New Construction
Construction
$250,000 to $500,000 est. value
Hachita, NM 88041

Dona ana Fire Station 1 Remodel and Addition
Renovation, Addition - 18,980 SF
Construction
Less than $1,020,000 est. value
Dona Ana, NM 88032

Manufactured Home for Thoreau Fire Station
New Construction
Post-Bid
Gallup, NM

Construction of Valley Fire Station 3
New Construction
Results
$790,000 to $800,000 est. value
Waterflow, NM 87416

Timberon Volunteer Fire Station
New Construction - 6,360 SF
Construction
Less than $750,000 est. value
Timberon, NM 88350

Newkirk Fire Station Stantec Project
New Construction
Post-Bid
Santa Rosa, NM 88435

La Plata Fire Station #2 Addition and Renovations
Renovation, Addition
Results
Less than $459,357 est. value
La Plata, NM 87418

Construction of Fire Station 3 Replacement
Construction
Las Cruces, NM 88004

Phil Chacon Memorial Substation South East Area Command - Addition
Addition - 8,020 SF
Results
$4,719,306 est. value
Albuquerque, NM 87108

Pecos Canyon Fire Station
Results
Tererro, NM 87573

Reported 09/28/2021 02:17 PM
Project Title

CNS Fire Department on The Northwest Development Area (NWDA), Melrose Air Force Range (MAFR), Roosevelt County, NM

Physical Address View project details and contacts
City, State (County) NM   (Roosevelt County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an 8,562sf Fire and Rescue Station in the newly developed Range Support Complex (RSC) in the northwest development area of Melrose Air Force Range (MAFR). The new facility will provide a bunkhouse and administrative area for the 24/7 operations of the firefighters and EMTs. This facility requires living quarters, restroom/shower area, kitchen, administrative and training areas, a self-contained breathing area (SCBA) storage area, and a vehicle apparatus bay. The facility is to be equipped with electric heating, ventilating and air conditioning (HVAC). This project includes utilities and the installation and tying- in of all communications. Fire suppression, a back-up generator, a septic system, potable water storage tank with fill valve and level indication, booster pumps, piping, valves, and appurtenances are included in this project. The facility is designed for 15 personnel including base firefighters, wildland firefighters (contracted) and an emergency medical team. The project also includes earthwork to include an unimproved parking area, site improvements, and associated facility support. THE PROJECT consists of construction of an 8,562sf Fire and Rescue Station in the newly developed Range Support Complex (RSC) in the northwest development area of Melrose Air Force Range (MAFR). The new facility will provide a bunkhouse and administrative area for the 24/7 operations of the firefighters and EMTs. This facility requires living quarters, restroom/shower area, kitchen, administrative and training areas, a self-contained breathing area (SCBA) storage area, and a vehicle apparatus bay. The facility is to be equipped with electric heating, ventilating and air conditioning (HVAC). This project includes utilities and the installation and tying- in of all communications. Fire suppression, a back-up generator, a septic system, potable water storage tank with fill valve and level indication, booster pumps, piping, valves, and appurtenances are included in this project. The facility is designed for 15 personnel including base firefighters, wildland firefighters (contracted) and an emergency medical team. The project also includes earthwork to include an unimproved parking area, site improvements, and associated facility support. Force protection measures NOTE TO INTERESTED VENDORS: Melrose Air Force Range is in a remote location with austere construction. Standard operating hours are 0800-0200. Construction must be planned within this timeframe. All employees of the contractor, subcontractors, and suppliers entering Melrose Air Force Range must be U.S. Citizens. A complete list of employees shall be supplied by the successful offeror and will be vetted through security forces prior to accessing the site. Contractors shall have access to Laser Eye Protection (LEP) when operating inside the laser footprint. The LEP’s shall be the responsibility of the contractor unless arrangements are made with the RMO to obtain/borrow LEP’s.

Details

Fire/Police Station, New Construction, Fire/Police Station, 8,562 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents