Similar Projects
Reported | 09/28/2021 02:17 PM |
Project Title | CNS Fire Department on The Northwest Development Area (NWDA), Melrose Air Force Range (MAFR), Roosevelt County, NM |
Physical Address | View project details and contacts |
City, State (County) | NM (Roosevelt County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | |
Project Status | Abandoned |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of an 8,562sf Fire and Rescue Station in the newly developed Range Support Complex (RSC) in the northwest development area of Melrose Air Force Range (MAFR). The new facility will provide a bunkhouse and administrative area for the 24/7 operations of the firefighters and EMTs. This facility requires living quarters, restroom/shower area, kitchen, administrative and training areas, a self-contained breathing area (SCBA) storage area, and a vehicle apparatus bay. The facility is to be equipped with electric heating, ventilating and air conditioning (HVAC). This project includes utilities and the installation and tying- in of all communications. Fire suppression, a back-up generator, a septic system, potable water storage tank with fill valve and level indication, booster pumps, piping, valves, and appurtenances are included in this project. The facility is designed for 15 personnel including base firefighters, wildland firefighters (contracted) and an emergency medical team. The project also includes earthwork to include an unimproved parking area, site improvements, and associated facility support. THE PROJECT consists of construction of an 8,562sf Fire and Rescue Station in the newly developed Range Support Complex (RSC) in the northwest development area of Melrose Air Force Range (MAFR). The new facility will provide a bunkhouse and administrative area for the 24/7 operations of the firefighters and EMTs. This facility requires living quarters, restroom/shower area, kitchen, administrative and training areas, a self-contained breathing area (SCBA) storage area, and a vehicle apparatus bay. The facility is to be equipped with electric heating, ventilating and air conditioning (HVAC). This project includes utilities and the installation and tying- in of all communications. Fire suppression, a back-up generator, a septic system, potable water storage tank with fill valve and level indication, booster pumps, piping, valves, and appurtenances are included in this project. The facility is designed for 15 personnel including base firefighters, wildland firefighters (contracted) and an emergency medical team. The project also includes earthwork to include an unimproved parking area, site improvements, and associated facility support. Force protection measures NOTE TO INTERESTED VENDORS: Melrose Air Force Range is in a remote location with austere construction. Standard operating hours are 0800-0200. Construction must be planned within this timeframe. All employees of the contractor, subcontractors, and suppliers entering Melrose Air Force Range must be U.S. Citizens. A complete list of employees shall be supplied by the successful offeror and will be vetted through security forces prior to accessing the site. Contractors shall have access to Laser Eye Protection (LEP) when operating inside the laser footprint. The LEP’s shall be the responsibility of the contractor unless arrangements are made with the RMO to obtain/borrow LEP’s. |
||||||||||||||||||||||||||||||||||||||||
Details | Fire/Police Station, New Construction, Fire/Police Station, 8,562 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |