Similar Projects
Building 22 Reroof
Alteration
Bidding
Sebring, FL 33870

Santa Rosa Correctional Institution Roof Repair
Alteration
Bidding
Milton, FL 32583

Windermere Elementary School - Roofing
Alteration
Sub-Bidding
Windermere, FL 34786

Sadler Elementary School - Roofing
Alteration
Sub-Bidding
Orlando, FL 32809

Roof Replacement at Omega Apartments
Post-Bid
Orlando, FL 32810

Rehabilitation Program - 7352 Cutwater Lane
Post-Bid
$10,001 to $20,000 est. value
Wesley Chapel, FL 33545

Screening Information Request/Request for Offer ORL VOR Roof Replacement, Orlando, FL
Results
$300,000 to $525,000 est. value
Orlando, FL

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

WUD, Plant 5 Repump Station - Roof and Exhaust Fans Replacement
Term Contract
Bidding
Boynton Beach, FL 33472

Mayme Frederick Service Center - Roof Replacement
Term Contract
Post-Bid
West Palm Beach, FL 33404

City Barn Roof and Interior Repairs
Results
Less than $38,774 est. value
Frostproof, FL 33843

Gutters, Fascia, Soffit, And Roof Repair/Replacement
Alteration
Bidding
FL

Florida DMS Pepper Building Reroof and Skylight Replacement
Post-Bid
Tallahassee, FL 32301

Roofing Preventative Maintenance and Remedial Repairs
Term Contract
Results
Less than $500,000 est. value
Naples, FL

Roof Repair / Replacement at Palm Lake Village Apartments
Alteration
Bidding
Dunedin, FL 34698

Last Updated 02/25/2022 08:26 AM
Project Title

Fairgrounds Livestock Arena Metal Roof Replacement

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34945   (Saint Lucie County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Provide permit from local building department as required 2. Provide all equipment, material and labor needed to remove, dispose and replace metal roof. 3. Remove roof panels and metal trim, exposing framework. 4. Clear loose debris from framework, spray with Rustoleum Rust Inhibitor (or approve equal) to reduce corrosion at point of contact. 5. Install 26GA Mill Finished PBR metal roof system designed for open frame construction. 6. Roof panels and components are to be fastened using #12x1-1/4” ZAC SD3 long life screws and non-corrosive rivets. 7. Install inside foam closures at end of roof panels. 8. Existing gutters to remain intact. 9. Provide a two-year (2) Workmanship Warranty. 10. Provide a twenty-five (25) Manufacturer Warranty against defects. 11. Remove and dispose of all roof related debris from project site. 12. All Pedestrian areas to be protected, closed off using barriers, cones, and caution tape.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents