Similar Projects
New Performing Arts Building
New Construction
Conception
Rio Grande City, TX

New Sale Park Pavilion Construction
New Construction - 2,100 SF
Conception
$500,000 est. value
Bryan, TX 77803

American Pavilion Renovation
Renovation
Design
College Station, TX

Arts, Culture & Events Center
New Construction - 45,000 SF
Design
$14,000,000 est. value
Edinburg, TX

2020 Bond Local Mobility Projects Construction
Term Contract
Bidding
$30,000,000 est. value
Austin, TX

Park Grant - Pugh Park Buildings
New Construction - 600 SF
Bidding
$225,000 est. value
Christoval, TX 76935

Concession/Restroom Building
New Construction
Sub-Bidding
Livingston, TX

Robert B. Green Campus Fencing Project
Renovation
Post-Bid
San Antonio, TX 78207

Horace Caldwell Pier Observation Deck
Post-Bid
Corpus Christi, TX 78401

Woodland/Oakridge Park Pavilion Project
Results
$193,128 est. value
Balch Springs, TX 75180

Construct Splash Park at Goodfellow AFB
New Construction
Results
San Angelo, TX 76908

Mueller Town Center Pavilion
New Construction - 12,707 SF
Construction
Austin, TX 78723

Traylor Stadium Press Box Replacement
Construction
Less than $4,157,000 est. value
Rosenberg, TX 77471

City Center
New Construction
Pending Verification
$5,400,000 est. value
Georgetown, TX

Forest Park Pool Renovation
Renovation - 6,875 SF
Conception
$3,000,000 est. value
Fort Worth, TX 76110

Reported 01/07/2022 12:00 AM
Project Title

Mary Heads Carter Park Pavilion Renovations

Physical Address View project details and contacts
City, State (County) Carrollton, TX 75006   (Dallas County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $333,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will generally include all construction, labor, materials, testing, and associated activities necessary for minor concrete walk replacement, partial demolition of structure, carpentry, new roof decking and standing seam metal roof at the existing Carrollton Mary Heads Carter Park. General project goals include replacement of lattice work with weather tight roofing, concrete repairs to walks, repainting structure, and carpentry.

Details

Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents