Similar Projects
Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Lift Station Improvements
New Construction
Results
$1,200,000 est. value
Charleston, WV

Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project
New Construction
Results
Charleston, WV

Lift Station 9 Upgrade
Results
Bridgeport, WV 26330

Contract IIIG Wastewater Collection and Treatment System Improvements
Alteration
Results
$6,800,000 est. value
Wheeling, WV

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Water System Improvements
New Construction
Results
$9,255,000 est. value
Fairmont, WV 26554

11th Street Pump Station Stabilization
Infrastructure
Results
Huntington, WV 25701

Franklin Elementary Sewer Extension
Renovation, Infrastructure
Post-Bid
Wellsburg, WV 26070

Reported 08/25/2021 12:00 AM
Project Title

Midway Pump Station Building

Physical Address View project details and contacts
City, State (County) Bluefield, WV   (Mercer County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work is for a Block Building with a Shingle Roof to enclose the Midway Pumping Station. The basic specifications are as follows: Dig and install concrete footer with appropriately sized rebar. Install Split-Face, 8? concrete blocks for all wall structures with a 2’x8' pressure treated wood wall plate. Install one standard steel walk in door and one 8' x 10' metal garage door. Install truss, roof package, and 25-year asphalt shingles.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents