Similar Projects
Phase 3 Regional Drainage Improvements - SW-002 - City of Elmo
Infrastructure
Conception
$500,000 est. value
Lake Elmo, MN

2022 Culvert Replacements
Infrastructure
Bidding
$135,000 est. value
MN

Ryan Drive and Keller Parkway Conveyance Upgrades
Post-Bid
$808,000 est. value
Little Canada, MN 55117

Road Materials
Post-Bid
Moorhead, MN

Directional Boring
New Construction
Results
Minneapolis, MN 55401

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Red Lake SFR Resurface
Post-Bid
Saint Paul, MN

Capital Improvement Project Maintenance/Repairs 2021
Results
$460,000 est. value
Little Canada, MN

Pipe and Culvert
Infrastructure
Post-Bid
Windom, MN

Watonwan and Brown County Judicial Ditch No. 18 Improvements
Term Contract
Results
$4,000,000 est. value

Sedan Ponds WMA Culvert Replacement
Infrastructure
Post-Bid
MN

2021 Culvert Replacement and Rehabilitation
Results
MN

Materials for Cedar Avenue Bridge No. 19J94
Term Contract, Infrastructure
Post-Bid
Lakeville, MN 55024

Opus Area Improvements Phase 2
Results
Minnetonka, MN

Marion Rest Area Drainfield Replacement
Infrastructure
Post-Bid
$476,000 est. value
Eyota, MN

Reported 07/01/2022 12:00 AM
Project Title

Phase 7A Closure and Cells 5C-7C Slope Liner Construction

Physical Address View project details and contacts
City, State (County) Faribault, MN   (Rice County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $637,350 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rough grading, furnish and install buffer layer, furnish and install double sided-textured LLDPE (closure) and double-sided textured HDPE (liner) geomembrane materials, furnish and install granular drainage materials (closure and liner), general fill, and topsoil, and seeding and mulching, installation of temporary and permanent erosion control features, and furnish and install of supplemental litter fence.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents