Similar Projects
Well Pump Installation
Infrastructure
Post-Bid
Woodbury, CT 06798

USCG Replace Condensate Receiver Pump Sets
Term Contract
Post-Bid
$100,000 to $150,000 est. value
New London, CT 06320

Well Testing and Drilling Services
Results
Less than $82,150 est. value
Mansfield Center, CT 06250

Occum Hall Fire Pump Replacement Project
Results
Windham, CT 06226

Godwin 4 IN. Dri-Prime HL 125M Emergency Water Pump 2021
Infrastructure
Post-Bid
Waterbury, CT

High Rise Geothermal Heat Pumps Replacement
Results
$197,800 est. value
Windham, CT 06226

Replace Chilled Water Pump CHWP-4
Infrastructure
Post-Bid
Farmington, CT

Grinder Pump for Low Pressure Sewer Collection System
Results
Waterford, CT

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure, Alteration
Post-Bid
Hartford, CT

Rehabilitation and Reconditioning of Fish Wells at Two State DEEP Hatcheries
Results
Kensington, CT

Sewer Feed Pump System Replacement
Infrastructure
Post-Bid
Ledyard, CT

Citywide Maintenance and Repair of Various Drains and Pumps
Results
Stamford, CT

WWW Hydraulic Turbine High Lift Pump and High Lift Pump 1 Repairs Project
Infrastructure
Results
Mansfield, CT

Stamford Campus Pump Replacement
Infrastructure
Results
Stamford, CT 06901

Installation of GHWTP Effluent Pump No. 3 Variable Frequency Drive
Infrastructure
Results
Manchester, CT

Reported 01/19/2022 12:00 AM
Project Title

Primary Effluent Pump Replacement

Physical Address View project details and contacts
City, State (County) Thomaston, CT 06787   (Litchfield County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of demolishing existing vertical turbine pumps and replacing with new (Owner pre-purchased) wet pit submersible pumps and related piping work, concrete repair work, new hatches required to retrofit into existing tank and electrical connections for new pump monitoring panels as required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents