Last Updated 11/11/2020 10:29 PM
Project Title

Rehabilitation/Reconstruction - York County

Physical Address View project details and contacts
City, State (County) SC   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 5.000 Ea Traffic Control 1.000 Ls Selected Clearing & Grubbing 1.000 Ls Removal & Disposal Of Existing Pavement 800.000 Sy Removal & Disposal Of Existing Curb 2,330.000 Lf Removal & Disposal Of Existing Concrete 9.000 Cy Unclassified Excavation 2,094.000 Cy Borrow Excavation 1,168.000 Cy Station Grading 77.640 Sta Excavation For Shoulder Paving 156.040 Sta Geogrid Reinforcement (Uniaxial) 1,627.000 Sy Hauling Of Excavated Shoulder Material 156.040 Sta Flowable Fill 1,101.000 Cy Cement Modified Recycled Base (10" Unif)-Curing Method b 32,209.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 35,505.000 Sy Portland Cement For Cement Modified Recycled Base Course 3,068.000 Ton Maintenance Stone 678.000 Ton Hot Mix Asphalt Base Course - Type b 1,548.800 Ton Hma Shoulder Widening Course 1,166.880 Ton Liquid Asphalt Binder Pg64-22 1,728.735 Ton Full Depth Asph. Pav. Patching 8" Unif 5,882.000 Sy Full Depth Asph. Pav. Patching 10"Unif 2,280.000 Sy Full Depth Asph. Pav. Patching 12"Unif 1,830.000 Sy Milling Existing Asphalt Pavement 1.25" 5,952.000 Sy Milling Existing Asphalt Pavement 1.5" 29,105.000 Sy Milling Existing Asphalt Pavement 1.75" 54,203.000 Sy Milling Existing Asphalt Pavement (Variable) 19,885.000 Sy Milled-In Rumble Strip 8.200 Mi Hot Mix Asphalt Intermediate Course Type b 7,036.245 Ton Hot Mix Asphalt Surface Course Type b 13,878.964 Ton Hot Mix Asphalt Surface Course Type c 4,921.184 Ton Hot Mix Asphalt Surface Course Type e 1,574.440 Ton Driveway Paving-Surface Type c 1,819.875 Ton Asphalt Surface Treatment(Single Treatment) 67,714.000 Sy Permanent Construction Signs (Ground Mounted) 3,116.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 15,335.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 191,564.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 4,186.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 4,590.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 126.000 Ea White Word Message "Only"-Fast Dry Paint 86.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 8.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 9,986.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 249,196.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 115.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 310.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 8,131.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 60,262.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 1,845.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 2,500.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 58.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 44.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 3.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 3,151.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 89,915.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 155.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 245.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 124.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,028.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 130.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 3,900.000 Lf Sawcut For Loop Detector 1,365.000 Lf Drop Inlet (24" x 24") 1.000 Ea Adjust Catch Basin 1.000 Ea Concrete Curb And Gutter(2`-0") Vertical Face 15.000 Lf Concrete Curb And Gutter (2`-6") Vertical Face 2,330.000 Lf Concrete Sidewalk(4" Uniform) 10.000 Sy Detectable Warning Material 400.000 Sf Concrete Median 23.000 Sy Pedestrian Ramp Construction 800.000 Sy Bituminous Curb 1,200.000 Lf Remove & Dispose Semi-Rigid Gr Device 250.000 Lf Premash Type t Tl3 Leading 50` 5.000 Ea Reset Fence 550.000 Lf Permanent Grassing For Non-Permitted Resurfacing Projects 4.550 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents