Similar Projects
HVAC Preventative Maintenance Services, NWS Romeoville, IL
Post-Bid
Romeoville, IL 60446

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

2020 HVAC Replacement
Results
Wheeling, IL 60090

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

Hot Water Heater Replacement
Results
Rock Island, IL 61201

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Last Updated 11/04/2020 02:46 PM
Project Title

Condensing Unit Replacement

Physical Address View project details and contacts
City, State (County) Crete, IL 60417   (Will County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing exterior condensing unit and associated refrigerant piping. Removal and replacement of existing AHU coil. Testing and balancing. Associated electrical work. Associated plumbing and sprinkler rework. Startup, testing, and adjustment of the new system. All other work indicated on the drawings and in the project manual for this project. All work on this project will be awarded to one prime contractor. If any asbestos containing materials are uncovered during the performance of the Work under this contract, the resultant asbestos abatement work will be performed by a separate abatement contractor under the direction of the Owner's consultant.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents