Similar Projects
Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Excavation and Grading of Kilkare Road
Infrastructure
Post-Bid
$100,000 est. value
Spooner, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Siren - Spooner, Fosmo Drive to West Hertel Drive
Results
Siren, Spooner, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Parking Lot Improvements
Infrastructure
Results
Shell Lake, WI

Spooner - Stone Lake, Crystal Brook Bridge, B-65-0060; Spooner - Stone Lake, USH 53 to South Junction CTH M
Infrastructure
Results
Spooner, WI

Spooner - Hayward, Greenwood Avenue to Poplar Street; Spooner - Hayward, Greenwood Avenue to Poplar Street
Infrastructure
Results
WI

Crack Seal, Micro-Surfacing, Slurry Leveling, and Pavement Marking
Infrastructure
Results
Burlington, Clintonville, Eagle River, Monroe, Osceola, Shell Lake, Sturgeon Bay, Waukesha, Waupaca, Wisconsin Rapids, WI

New Auburn - Spooner, Pine Grove Road to Wildcat Road, NB and SB
Infrastructure
Results
$15,000,000 to $16,999,999 est. value
WI

Minong Campground Expansion
Infrastructure
Results
$428,487 CJ est. value
Minong, WI 54859

Last Updated 09/08/2022 06:32 PM
Project Title

Minong - Hayward Construction / Resurface

Physical Address View project details and contacts
City, State (County) Minong, WI 54859   (Washburn County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Minong - Hayward, CTH G to CTH M; Minong - Hayward, CTH I to CTH G; Washburn County; 8550-00-70, WISC 2022 523; 8550-02-72, WISC 2022 524; STH 77; 12.819 Miles; Base, HMA Pavement, Curb and Gutter, Sidewalk, Beam Guard, Pavement Marking, Signs, and Culverts Estimate Anticipated Funding: $3,000,000 - $3,999,999 and $4,000,000 - $4,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 25 - Minong - Hayward Construction / Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents