Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Dallas Salmon Wastewater Treatment Plant Operations Center
New Construction - 10,000 SF
Design
$5,003,625 est. value
League City, TX 77573

2021 WWTP Expansion
Addition
Bidding
Canton, TX

Pirates Beach Wastewater Treatment Plant Replacement
Renovation
Bidding
$8,500,000 est. value
Galveston, TX

Toledo Bend Frontier Park WWTP Improvements
Post-Bid
Burkeville, TX 75932

Highlands Wastewater Treatment Plant Phase I - 0.250 MGD
Post-Bid
Porter Heights, TX 77365

Raw Water Supply and Distribution Additions to Edinburg WWTP Resevoir
Results
Edinburg, TX 78541

Wastewater Treatment Plant Expansion to 1.90 MGD
Results
Less than $9,763,030 est. value
San Leon, TX 77539

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

New Solid Waste and Recycling Facility
New Construction
Pending Verification
$6,530,000 est. value
Temple, TX

Port Arthur Main WWTP Improvements Project
Renovation
Bidding
$53,000,000 to $55,500,000 est. value
Port Arthur, TX 77642

0.120 MGD Wastewater Treatment Plant Project
Post-Bid
Woodloch, TX 77385

Village Creek WRF Sludge Thickening Improvements
Results
$17,000,000 to $19,000,000 est. value
Fort Worth, TX

Doshier Wastewater Treatment Plant Expansion
Addition
Pending Verification
$18,000,000 est. value
Temple, TX 76501

Last Updated 11/09/2021 02:19 PM
Project Title

Remove and Re-Install New Clarifier H-40

Physical Address View project details and contacts
City, State (County) Three Rivers, TX 78071   (Live Oak County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removing and re-installing a new Clarifier H-40 in the Waste Water Treatment Plant. The removing and re-installation will take place at SPC Three Rivers located in Three Rivers, Texas. 1. Block up/brace existing clarifier internals. 2. Disconnect electrical conduit & wiring as needed to facilitate gear drive removal. 3. Remove existing bridge/service platform assembly. 4. Remove existing gear drive. We will remove existing grout. 5. Clean/replace all thread rods, nuts, washers as needed in center pier. 6. Install new H-40 gear drive. 7. Check elevations and adjust as needed. 8. Re-install bridge/service platform assembly. 9. Re-connect electrical conduit/wiring and test for proper operation and shutdown. 10. Perform necessary true plane procedures as required by the manufacturer. 11. Grout in gear drive after true plane completion. 12. Supply and top off/fill, primary, secondary, & tertiary reducer with proper lubricant. 13. Test run gear drive after installation and make any adjustments as needed. 14. Provide operator training upon completion of install. We will provide start up report

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting and Coating.
Division 11 - Equipment, Laboratory Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents