Similar Projects
Cold Storage Building
New Construction
Post-Bid
Lincoln, NE

Self Storage Building Retrofit
New Construction, Demolition
Post-Bid
Lincoln, NE 68508

Bar Mill Upgrades
Renovation
Pending Verification
$58,000,000 est. value
Norfolk, NE 68701

Pole Building for Parks Department
New Construction
Results
Lincoln, NE

Yanney Park Maintenance Building
New Construction
Post-Bid
$400,000 to $600,000 est. value
Kearney, NE

Last Updated 10/25/2021 10:30 AM
Project Title

Elmwood Golf Course Cart Shed Addition and Renovation

Physical Address View project details and contacts
City, State (County) Omaha, NE 68106   (Douglas County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the construction of an addition and renovation of an existing golf cart shed. Work includes selective demolition of the existing structure and surrounding pavements, earthwork, concrete pavement, pipe bollards, building foundation & slab concrete, unit masonry, rough & finish carpentry, wood trusses, asphalt shingles, mineral fiber-cement siding & trim, flashing & sheet metal, joint sealers, steel doors & frames, sectional overhead doors (salvage and reinstallation), wood windows & glazing, hardware and painting.

Details

Warehouse/Storage, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents