Similar Projects
Beechurst and 1st St Intersection Improvements - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

Lenore - Blocton
Infrastructure
Design
$1,127,000 CJ est. value
Delbarton, WV 25670

Roanoke - South Weston Road
Infrastructure
Design
$6,200,000 CJ est. value
Weston, WV 26452

Upgrade to 5 Lane Road - WV 622 Cross Lanes
Infrastructure
Bidding
$16,000,000 CJ est. value
Charleston, WV 25312

Const New/reloc Road - Hideaway Road Phase II
Infrastructure
Bidding
$929,000 CJ est. value
Clarksburg, WV 26301

Hardy County Office and Garage Facility
New Construction, Infrastructure - 6,000 SF
Post-Bid
$3,394,000 CJ est. value
Moorefield, WV 26836

Holden Br-Fountain Place Mall
Infrastructure
Post-Bid
$700,000 CJ est. value
Holden, WV 25625

Arcadia Springs North Phase 2 Water Main
Infrastructure
Results
Martinsburg, WV 25405

Beech Creek Waterline Extension Project
Infrastructure
Results
WV

The Villas at Warm Springs
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Martinsburg, WV 25401

Health Rite Medical Facility Expansion
Addition, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Charleston, WV 25311

Menards - Charles Pointe Crossing / Bridgeport
New Construction, Infrastructure - 200,000 SF
Design
$12,000,000 CJ est. value
Bridgeport, WV 26330

Replacing Existing Storm Drainpipes and Drop Inlets
Infrastructure
Bidding
$8,000,000 CJ est. value
Ronceverte, WV 24970

Spray Applied and Spin Cast Pipe Lining
Infrastructure
Post-Bid
$300,000 est. value
Charleston, WV

East Fairmont Junior High Improvements
Infrastructure, Alteration
Results
Fairmont, WV

Last Updated 02/24/2023 03:05 PM
Project Title

Water Storage System Improvements

Physical Address View project details and contacts
City, State (County) Harrisville, WV 26362   (Ritchie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,438,459 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: 1 LS Mobilization/Demobilization, 1 LS Erosion & Sediment Control, 1 LS Rehabilitation of Existing 1,000,000 gallon Water Storage Tank, 1 LS Removal and Replacement of existing 500,000 gallon Welded Steel Tank and Foundation with 855,000 gallon Tank, 1 LS Access Road Complete, 1 LS Relocation of Existing Utilities, 250 CY Removal of Unsuitable Material, 250 CY Concrete Backfill, 1 LS Reclamation of Disturbed Areas. The Work will be substantially completed within 280 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 310 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents