Similar Projects
Radioisotope Production Facility (RPF) at Discovery Ridge Research Park
New Construction, Infrastructure - 50,000 SF
Conception
$108,000,000 CJ est. value
Columbia, MO 65201

Material Recovery Facility Expansion Phase 2 - RF074 - 1551 - City of Columbia
Addition, Infrastructure
Conception
$11,150,000 CJ est. value
Columbia, MO 65202

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Home2 Suites by Hilton / Columbia
New Construction, Infrastructure - 50,000 SF
Design
$27,000,000 CJ est. value
Columbia, MO 65203

Perche Creek Bridge and Trail Project - Phase 1
Infrastructure
Bidding
$500,000 CJ est. value
Columbia, MO 65203

South Farm Swine Research & Education Facility Construct Addition
Addition, Demolition, Infrastructure
Bidding
$3,940,558 CJ est. value
Columbia, MO 65211

Columbia Public Schools - New Southwest Elementary School (SWES) - BP 01
New Construction, Infrastructure
Sub-Bidding
$15,000,000 CJ est. value
Columbia, MO 65201

Forum Boulevard Improvements
Infrastructure
Post-Bid
$1,345,495 CJ est. value
Columbia, MO 65203

Quail Drive Stormwater Improvement Project - City of Columbia
Infrastructure
Post-Bid
$479,225 CJ est. value
Columbia, MO 65202

Judy School Road Well Improvements
New Construction, Infrastructure
Results
$1,577,102 CJ est. value
Columbia, MO 65202

Judy School Road Well Improvements
New Construction, Infrastructure
Results
$1,577,102 CJ est. value
Columbia, MO 65202

The Baptist Home at Ashland / Continuum of Care Facility
Addition, Demolition, Infrastructure - 49,900 SF
Construction
$13,338,832 CJ est. value
Ashland, MO 65010

O'Reilly Auto Parts (CO5) #6643 / Columbia
New Construction, Infrastructure - 6,972 SF
Construction
$1,300,000 CJ est. value
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Last Updated 02/20/2024 12:03 PM
Project Title

West Ash Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Columbia, MO 65203   (Boone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Columbia reserves the right to reject any or all proposals Questions must be submitted no later than 5:00 p.m. on June 14, 2023 All questions concerning the solicitation and specifications shall be submitted in writing via e-mail to the name below. You are encouraged to submit your questions via e-mail. Cale Turner Phone: 573-874-7375 E-mail: cale.turner@como.gov A. The Work is located at the West Ash Pump Station 1915 West Ash St., Columbia, MO 654203. B. The Work to be performed under this Contract includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Replacement of existing 2,400 V electrical equipment with 480 V equipment. 2. Addition of emergency stand-by generator and automatic transfer switch. 3. New motors and variable frequency drives for the existing pumps. 4. Replace the motor control center and panel boards. 5. Convert existing chlorine feed and storage rooms to new electrical room. 6. Process pipe and valve modifications in the pump discharge piping. 7. Installation of new process pipe, meter, and valve in existing north discharge pipeline meter vault. 8. Construction of new pump station meter vault in the south discharge pipeline. 9. Painting/coating. 10. Instrumentation improvements. 11. Replacement of existing lighting fixtures with high-efficient LEDs. 12. HVAC improvements including demolition of existing boiler. 13. Architectural and structural improvements, including roof replacement.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents