Last Updated | 02/20/2024 12:03 PM |
Project Title | West Ash Pump Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Columbia, MO 65203 (Boone County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Columbia reserves the right to reject any or all proposals Questions must be submitted no later than 5:00 p.m. on June 14, 2023 All questions concerning the solicitation and specifications shall be submitted in writing via e-mail to the name below. You are encouraged to submit your questions via e-mail. Cale Turner Phone: 573-874-7375 E-mail: cale.turner@como.gov A. The Work is located at the West Ash Pump Station 1915 West Ash St., Columbia, MO 654203. B. The Work to be performed under this Contract includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Replacement of existing 2,400 V electrical equipment with 480 V equipment. 2. Addition of emergency stand-by generator and automatic transfer switch. 3. New motors and variable frequency drives for the existing pumps. 4. Replace the motor control center and panel boards. 5. Convert existing chlorine feed and storage rooms to new electrical room. 6. Process pipe and valve modifications in the pump discharge piping. 7. Installation of new process pipe, meter, and valve in existing north discharge pipeline meter vault. 8. Construction of new pump station meter vault in the south discharge pipeline. 9. Painting/coating. 10. Instrumentation improvements. 11. Replacement of existing lighting fixtures with high-efficient LEDs. 12. HVAC improvements including demolition of existing boiler. 13. Architectural and structural improvements, including roof replacement. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |