Similar Projects
Judicial Ditch No. 9 Bid Package 3
Infrastructure
Bidding
$1,880,000 est. value

Judicial Ditch No. 9 Bid Package 3
Infrastructure
Bidding
$1,880,000 est. value

Improvement of Judicial Ditch No. 24
Results
$400,000 to $1,900,000 est. value
Jackson, MN

Judicial Ditch No. 9 Improvements Bid Package 1
Results
$1,205,000 est. value

Judicial Ditch No. 9 Bid Package 1
Infrastructure
Bidding
$1,180,000 est. value

Judicial Ditch No. 13 Improvements Bid Package 3
Results
$585,800 est. value

Judicial Ditch No. 9 Bid Package 4
Infrastructure
Bidding
$623,000 est. value

Judicial Ditch No. 13 Improvements Bid Package 1
Results
$1,225,000 est. value

Bridge Replacement with Box Culvert
Renovation, Infrastructure
Bidding
MN

Judicial Ditch No. 13 Improvements Bid Package 2
Results
$668,500 est. value

Judicial Ditch No. 9 - Bid Package 2
Infrastructure
Bidding
$885,000 est. value

Grein Residential Development Phase 1
New Construction, Infrastructure
Results
Lakefield, MN

Jackson County Judicial Ditch No. 6 Repair
Infrastructure
Results
$930,000 est. value
MN

Heron Lake Watershed District Judicial Ditch No. 3 Bid Package 2
Infrastructure
Results
$670,000 est. value
Heron Lake, MN

Heron Lake Watershed District Judicial Ditch No. 3 Bid Package 1
Infrastructure
Results
$580,000 est. value
Heron Lake, MN

Last Updated 01/27/2022 04:15 PM
Project Title

Judicial Ditch No. 13 Bid Package 7

Physical Address View project details and contacts
City, State (County) (Jackson, Nobles Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $880,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the following major quantities of Work: A. Approximately 76,400 CY of excavation material for the construction of 4.74 acre storage basin #2 with a concrete control structure, seeding and erosion control B. Approximately 75,600 CY of excavation material for the construction of 4.20 acre storage basin #3 with a concrete control structure, seeding and erosion control

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents