Similar Projects
The Links Apartments - Long Island City
New Construction - 9,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Long Island City, NY 11101

The Links Apartments - Long Island City
New Construction - 9,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Long Island City, NY 11101

Ulta Beauty at Target #2451
Renovation - 1,000 SF
Design
Flushing, NY 11354

Ulta Beauty at Target #3230
Renovation - 1,000 SF
Design
Forest Hills, NY 11375

Lenscrafters
Renovation - 2,365 SF
Post-Bid
Queens, NY 11375

IDIQ Contract for all Inclusive Maintenance in Move-Out Apartments Queen/Staten Island Focus
Term Contract
Post-Bid
Queens, Staten Island, NY

Apex Place Mixed Use Development
New Construction - 1,365,000 SF
Construction
$10,000,000 CJ est. value
Queens Village, NY

Jackson Avenue Commercial Development
New Construction - 159,461 SF
Construction
Queens, NY 11101

Archer Avenue Mixed-Use
New Construction
Pending Verification
Queens, NY 11433

Archer Avenue Mixed-Use
New Construction
Pending Verification
Queens, NY 11433

Ulta Beauty at Target #1344
Renovation - 1,000 SF
Design
Rego Park, NY 11374

Hamilton-Madison House Improvements
Renovation - 12,185 SF
Post-Bid
Queens, NY

26-79 30th Street Apartments
New Construction - 11,610 SF
Construction
$290,000 est. value
Queens, NY 11102

101st Avenue Mixed Use Development
New Construction - 17,238 SF
Pending Verification
Queens, NY 11416

Ulta Beauty at Target #3280
Renovation - 1,000 SF
Design
Elmhurst, NY 11373

Reported 03/30/2022 08:14 AM
Project Title

61-13 Utopia Parkway Mixed Use

Physical Address View project details and contacts
City, State (County) Queens, NY 11365   (Queens County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Retail
Contracting Method General Contractor to Subcontract.
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, New Construction, Apartments/Condominiums, 16,849 SF New Construction, 4.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents