Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Segmented Pipe Liner
Term Contract
Post-Bid
UT

Uintah Indian Irrigation Project
Post-Bid
Duchesne, UT

Crab Creek Restoration
Results
$310,000 to $330,000 est. value
Provo, UT 84606

Cottonwood Heights Recreation Improvements Project
Results
Cottonwood Heights, UT 84121

Oquirrh Hills Golf Course Pond 2 Expansion Project
Post-Bid
Tooele, UT

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

Sunbrook Golf Course Drainage
Post-Bid
Saint George, UT 84770

Traverse Mountain Emergency Watershed Protection
Results
Lehi, UT 84043

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

Mcelmo Creek Bridge - 037012C
Results
$1,500,000 to $3,000,000 est. value
UT

Kolob Terrace Road Retaining Walls
Infrastructure
Post-Bid
Saint George, UT

Pratt Aquatic Center - Pool Deck Drain Repair
Results
$175,900 est. value
Tooele, UT 84074

Construction of the Upper Telluride Penstock Pipeline Replacement Phase 1
New Construction, Infrastructure
Post-Bid
Beaver, UT

Meadow MS4 Project
Results
Meadow, UT

Last Updated 06/21/2022 06:07 AM
Project Title

East Bench-Garr Spring Culvert

Physical Address View project details and contacts
City, State (County) Millville, UT 84326   (Cache County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a bridge / tunnel in Cache Jct, Utah. Completed plans call for site work for a bridge / tunnel. Division of Forestry, Fire and State Lands. Replace and install new culvert across the Bonneville Shoreline Trail along the east Bench area of Cache Valley. Must attend Mandatory Site Visit to Bid. Utah DNR Forestry, Fire and State Lands is working to improve access for emergency vehicles responding to fires in the wildland urban interface (WUI.) The area of the proposed project is along the east bench of Cache Valley, one of the fastest growing WUI areas in the Bear River Area of northern Utah. The Bonneville Shoreline Trail runs along the east bench of Cache Valley and acts as a service road between Dry Canyon and Millville Canyon above the continuous "deer fence" that parallels the trail.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents